Conductor pipe shall be cemented with sufficient cement to fill the annular space from the shoe to the surface. An annular blowout preventer, or its equivalent, approved by the Division, shall be installed on conductor pipe for exploratory wells and development wells when deemed necessary by the Division. The Division may waive this requirement for low-temperature geothermal wells.
Cal. Code Regs. Tit. 14, § 1935.1
2. Editorial correction of NOTE (Register 96, No. 36).
3. Change without regulatory effect amending section filed 12-26-2006 pursuant to section 100, title 1, California Code of Regulations (Register 2006, No. 52).
Note: Authority cited: Section 3714, Public Resources Code. Reference: Sections 3739 and 3740, Public Resources Code.