Current through Register 2024 Notice Reg. No. 49, December 6, 2024
(a) Subchapter 2 shall apply to: (1) the perimeters and access to all residential, commercial, and industrial Building construction within the SRA approved after January 1, 1991, and those approved after July 1, 2021 within the VHFHSZ, except as set forth below in subsection (b).(2) the siting of newly installed commercial modulars, manufactured homes, mobilehomes, and factory-built housing, as defined in Health and Safety Code sections 18001.8, 18007, 18008, and 19971;(3) all tentative and parcel maps or other Developments approved after January 1, 1991; and(4) applications for Building permits on a parcel approved in a pre-1991 parcel or tentative map to the extent that conditions relating to the perimeters and access to the Buildings were not imposed as part of the approval of the parcel or tentative map.(b) Subchapter 2 does not apply where an application for a Building permit is filed after January 1, 1991 for Building construction on a parcel that was formed from a parcel map or tentative map (if the final map for the tentative map is approved within the time prescribed by the local ordinance) approved prior to January 1, 1991, to the extent that conditions relating to the perimeters and access to the Buildings were imposed by the parcel map or final tentative map approved prior to January 1, 1991.(c) Affected activities include, but are not limited to: (1) permitting or approval of new parcels, excluding lot line adjustments as specified in Government Code (GC) section 66412(d);(2) application for a Building permit for new construction not relating to an existing Structure;(3) application for a use permit;(4) Road construction including construction of a Road that does not currently exist, or extension of an existing Road.(d) The standards in Subchapter 2 applicable to Roads shall not apply to Roads used solely for Agriculture; mining; or the management of timberland or harvesting of forest products.Cal. Code Regs. Tit. 14, § 1270.03
1. New section filed 5-30-91; operative 5-30-91 pursuant to Government Code section 11346.2(d) (Register 91, No. 27).
2. Amendment of section and NOTE filed 1-31-2013; operative 4-1-2013 (Register 2013, No. 5).
3. Amendment of section heading and section filed 9-6-2019; operative 1-1-2020 (Register 2019, No. 36).
4. Change without regulatory effect amending subsection (a) filed 2-1-2021 pursuant to section 100, title 1, California Code of Regulations (Register 2021, No. 6).
5. Renumbering of former section 1270.03 to section 1270.04 and new section filed 1-31-2023; operative 4-1-2023 (Register 2023, No. 5). Transmission deadline specified in Government Code section 11346.4(b) extended 60 calendar days pursuant to Executive Order N-40-20 and an additional 60 calendar days pursuant to Executive Order N-71-20. Filing deadline specified in Government Code section 11349.3(a) extended 60 calendar days pursuant to Executive Order N-40-20 and an additional 60 calendar days pursuant to Executive Order N-71-20. Note: Authority cited: Section 4290, Public Resources Code. Reference: Sections 4290 and 4291, Public Resources Code.
1. New section filed 5-30-91; operative 5-30-91 pursuant to Government Code section 11346.2(d) (Register 91, No. 27).
2. Amendment of section and Note filed 1-31-2013; operative 4-1-2013 (Register 2013, No. 5).
3. Amendment of section heading and section filed 9-6-2019; operative 1/1/2020 (Register 2019, No. 36).
4. Change without regulatory effect amending subsection (a) filed 2-1-2021 pursuant to section 100, title 1, California Code of Regulations (Register 2021, No. 6).
5. Renumbering of former section 1270.03 to section 1270.04 and new section filed 1-31-2023; operative 4/1/2023 (Register 2023, No. 5). Transmission deadline specified in Government Code section 11346.4(b) extended 60 calendar days pursuant to Executive Order N-40-20 and an additional 60 calendar days pursuant to Executive Order N-71-20. Filing deadline specified in Government Code section 11349.3(a) extended 60 calendar days pursuant to Executive Order N-40-20 and an additional 60 calendar days pursuant to Executive Order N-71-20.