The Plan submitter shall maintain all drainage structures, Drainage Facilities and gating or other devices to prevent access required by these Rules in effective working condition throughout one Winter Period after completion of Timber Operations unless other stricter measures are required under the Forest Practice Rules. Skid trails, Landings and work areas shall be reseeded, mulched or protected by compacting Slash and debris from harvest operation. The Director may require further measures to prevent unnecessary damage to road surfaces from unauthorized use and to protect the quality and Beneficial Uses of water. The County representative responsible for review of timber harvests shall receive advanced notice and may attend the work completion inspection with the Department to review Erosion Control measures. A work completion report may not be filed until this requirement has been met.
Cal. Code Regs. Tit. 14, § 926.19
2. Amendment filed 7-1-99; operative 1-1-2000 (Register 99, No. 27).
3. Change without regulatory effect amending section filed 10-31-2017 pursuant to section 100, title 1, California Code of Regulations (Register 2017, No. 44).
Note: Authority cited: Section 4516.5, Public Resources Code. Reference: Section 4516.5, Public Resources Code.
2. Amendment filed 7-1-99; operative 1-1-2000 (Register 99, No. 27).
3. Change without regulatory effect amending section filed 10-31-2017 pursuant to section 100, title 1, California Code of Regulations (Register 2017, No. 44).