Cal. Code Regs. Tit. 13, § 2172.9
Note: Authority cited: Sections 39500, 39600, 39601, 43013, 43018, 43100, 43101, 43102, 43104, 43105, 43106, 43107 and 43806, Health and Safety Code; and Section 28114, Vehicle Code. Reference: Sections 39002, 39003, 39500, 39667, 43000, 43009.5, 43013, 43017, 43018, 43100, 43101, 43101.5, 43102, 43104, 43105, 43106, 43107, 43202, 43204, 43205, 43205.5, 43206, 43210, 43211, 43212, 43213 and 43806, Health and Safety Code; and Section 28114, Vehicle Code.
2. Repealer filed 11-8-2010; operative 12-8-2010 (Register 2010, No. 46).