Ariz. Admin. Code § 18-5-204

Current through Register Vol. 30, No. 24, June 14, 2024
Section R18-5-204 - Approval of Construction
A. A public or semipublic swimming pool or spa shall not operate without receiving an Approval of Construction issued by the Department.
B. The construction of a public or semipublic swimming pool or spa shall conform to plans and specifications that have been approved by the Department. If the applicant wishes to make a change to the approved plans and specifications, the applicant shall submit revised plans and specifications with a written statement of the reasons for the change to the Department. The applicant shall obtain Department approval of the revised plans and specifications before starting any work affected by the change.
C. Prior to any construction that will cover the piping arrangement of the swimming pool or spa and at least 30 days prior to the expected date of completion of construction of a public swimming pool or spa, the applicant shall notify the Department to permit a construction inspection. The Department shall inspect the construction of a swimming pool or spa to determine if the swimming pool or spa has been constructed in accordance with Department-approved plans, specifications, and conditions unless a professional engineer, architect, or registered sanitarian certifies that the swimming pool or spa has been constructed in accordance with Department-approved plans, specifications, and conditions.
D. If the swimming pool or spa has been constructed in accordance with Department-approved plans, specifications, and conditions, the Department shall issue the Approval of Construction within 30 days of the date of the construction inspection by the Department or the date the Department receives third-party certification.

Ariz. Admin. Code § R18-5-204

Adopted effective February 19, 1998 (Supp. 98-1).