Ariz. Admin. Code § 18-2-904

Current through Register Vol. 30, No. 50, December 13, 2024
Section R18-2-904 - Standards of Performance for Incinerators
A. Incinerators with a charging rate of more than 45 metric tons or 49.6 tons per day shall conform to the requirements of 40 CFR 60.50 through 60.54.
B. Incinerators with a charging rate of 45 metric tons or 49.6 tons per day or less that commence construction or modification after May 14, 1979, shall conform to the requirements of 40 CFR 60.52 through 60.54 and of R18-2-704(A).

Ariz. Admin. Code § R18-2-904

Adopted effective May 14, 1979 (Supp. 79-1). Amended effective May 28, 1982 (Supp. 82-3). Former Section R9-3-904 renumbered without change as Section R18-2-904 (Supp. 87-3). Repealed effective February 26, 1988 (Supp. 88-1). New Section R18-2-904 renumbered from R18-2-804 and amended effective November 15, 1993 (Supp. 93-4).