Current through Register Vol. 30, No. 43, October 25, 2024
Section R18-2-1428 - Transition from the Interim Period to the Control Strategy PeriodA. For areas which submit a control strategy implementation plan revision after November 24, 1993: 1. The transportation plan and TIP shall be demonstrated to conform according to transitional period criteria and procedures by one year from the date the CAA requires submission of such control strategy implementation plan revision. Otherwise, the conformity status of the transportation plan and TIP will lapse, and no new project-level conformity determinations may be made.a. The conformity of new transportation plans and TIPs may be demonstrated according to Phase II interim period criteria and procedures for 90 days following submission of the control strategy implementation plan revision, provided the conformity of such transportation plans and TIPs is redetermined according to transitional period criteria and procedures as required in subsection (A)(1) and such transportation plans and TIPs are consistent with the motor vehicle emissions budget in the applicable implementation plan or any previously submitted control strategy implementation plan revision.b. Beginning 90 days after submission of the control strategy implementation plan revision, new transportation plans and TIPs shall demonstrate conformity according to transitional period criteria and procedures.2. If EPA disapproves the submitted control strategy implementation plan revision and so notifies the state, the MPO where one exists, and USDOT, which initiates the sanction process under CAA §§ 179 or 110(m), the conformity status of the transportation plan and TIP shall lapse 120 days after EPA's disapproval, and no new project-level conformity determinations may be made. No new transportation plan, TIP, or project may be found to conform until another control strategy implementation plan revision is submitted and conformity is demonstrated according to transitional period criteria and procedures.3. Notwithstanding subsection (A)(2), if EPA disapproves the submitted control strategy implementation plan revision but determines that the control strategy contained in the revision would have been considered approvable with respect to requirements for emission reductions if all committed measures had been submitted in enforceable form as required by CAA § 110(a)(2)(A), the provisions of subsection (A)(1) shall apply for 12 months following the date of disapproval. The conformity status of the transportation plan and TIP shall lapse 12 months following the date of disapproval unless another control strategy implementation plan revision is submitted to EPA and found to be complete.B. For areas which have not submitted a control strategy implementation plan revision: 1. For areas whose CAA deadline for submission of the control strategy implementation plan revision is after November 24, 1993, and EPA has notified the state, the MPO where one exists, and USDOT of the state's failure to submit a control strategy implementation plan revision, which initiates the sanction process under CAA §§ 179 or 110(m) all of the following shall apply:a. No new transportation plans or TIPs may be found to conform beginning 120 days after the CAA deadline.b. The conformity status of the transportation plan and TIP shall lapse one year after the CAA deadline, and no new project-level conformity determinations may be made.2. For areas whose CAA deadline for submission of the control strategy implementation plan was before November 24, 1993, and EPA has made a finding of failure to submit a control strategy implementation plan revision, which initiates the sanction process under CAA §§ 179 or 110(m), all of the following apply unless the failure has been remedied and acknowledged by a letter from the EPA Regional Administrator:a. No new transportation plans or TIPs may be found to conform beginning March 24, 1994.b. The conformity status of the transportation plan and TIP shall lapse November 25, 1994, and no new project-level conformity determinations may be made.C. For areas which have not submitted a complete control strategy implementation plan revision: 1. For areas where EPA notifies the state, the MPO where one exists, and USDOT after November 24, 1993, that the control strategy implementation plan revision submitted by the state is incomplete, which initiates the sanction process under CAA §§ 179 or 110(m), all of the following apply unless the failure has been remedied and acknowledged by a letter from the EPA Regional Administrator: a. No new transportation plans or TIPs may be found to conform beginning 120 days after EPA's incompleteness finding.b. The conformity status of the transportation plan and TIP shall lapse one year after the CAA deadline, and no new project-level conformity determinations may be made.c. Notwithstanding subsections (C)(1)(a) and (b), if EPA notes in its incompleteness finding that the submittal would have been considered complete with respect to requirements for emission reductions if all committed measures had been submitted in enforceable form as required by CAA § 110(a)(2)(A), the provisions of subsection (A)(1) shall apply for a period of 12 months following the date of the incompleteness determination. The conformity status of the transportation plan and TIP shall lapse 12 months following the date of the incompleteness determination unless another control strategy implementation plan revision is submitted to EPA and found to be complete.2. For areas where EPA has determined before November 24, 1993, that the control strategy implementation plan revision is incomplete, which initiates the sanction process under CAA §§ 179 or 110(m), all of the following apply unless the failure has been remedied and acknowledged by a letter from the EPA Regional Administrator:a. No new transportation plans or TIPs may be found to conform beginning March 24, 1994.b. The conformity status of the transportation plan and TIP shall lapse November 25, 1994, and no new project-level conformity determinations may be made.c. Notwithstanding subsections (C)(2)(a) and (b), if EPA notes in its incompleteness finding that the submittal would have been considered complete with respect to requirements for emission reductions if all committed measures had been submitted in enforceable form as required by CAA § 110(a)(2)(A), the provisions of subsection (D)(1) shall apply for a period of 12 months following the date of the incompleteness determination. The conformity status of the transportation plan and TIP shall lapse 12 months following the date of the incompleteness determination unless another control strategy implementation plan revision is submitted to EPA and found to be complete.D. For areas which submitted a control strategy implementation plan before November 24, 1993:1. The transportation plan and TIP shall have been demonstrated to conform according to transitional period criteria and procedures by November 25, 1994. Otherwise, their conformity status will lapse, and no new project-level conformity determinations may be made. From and after February 22, 1994, new transportation plans and TIPs shall demonstrate conformity according to transitional period criteria and procedures.2. If EPA has disapproved the most recent control strategy implementation plan submission, the conformity status of the transportation plan and TIP shall lapse March 24, 1994, and no new project-level conformity determinations may be made. No new transportation plans, TIPs, or projects may be found to conform until another control strategy implementation plan revision is submitted and conformity is demonstrated according to transitional period criteria and procedures.3. Notwithstanding subsection (D)(2), if EPA has disapproved the submitted control strategy implementation plan revision but determines that the control strategy contained in the revision would have been considered approvable with respect to requirements for emission reductions if all committed measures had been submitted in enforceable form as required by CAA § 110(a)(2)(A), the provisions of subsection (D)(1) shall apply until November 25, 1994. The conformity status of the transportation plan and TIP shall lapse November 25, 1994, unless another control strategy implementation plan revision is submitted to EPA and found to be complete.E. If the currently conforming transportation plan and TIP have not been demonstrated to conform according to transitional period criteria and procedures, the requirements of subsections (E)(1) and (2) shall be met.1. Before a FHWA or FTA project which is regionally significant and increases single-occupant vehicle capacity (a new general purpose highway on a new location or adding general purpose lanes) may be found to conform, ADEQ shall be consulted on how the emissions which the existing transportation plan and TIP's conformity determination estimates for the Action scenario, as required by R18-2-1422 through R18-2-1427, compare to the motor vehicle emissions budget in the implementation plan submission or the projected motor vehicle emissions budget in the implementation plan under development.2. In the event of unresolved disputes on such project-level conformity determinations, ADEQ may escalate the issue to the governor consistent with the procedure in R18-2-1405, which applies for ADEQ comments on a conformity determination.F. Redetermination of conformity of the existing transportation plan and TIP according to the transitional period criteria and procedures:1. The redetermination of the conformity of the existing transportation plan and TIP according to transitional period criteria and procedures (as required by subsections (A)(1) and (D)(1)) does not require new emissions analysis and does not have to satisfy the requirements of R18-2-1410 and R18-2-1411 if all of the following are met:a. The control strategy implementation plan revision submitted to EPA uses the MPO's modeling of the existing transportation plan and TIP for its projections of motor vehicle emissions.b. The control strategy implementation plan does not include any transportation projects which are not included in the transportation plan and TIP.2. A redetermination of conformity as described in subsection (F)(1) is not considered a conformity determination for the purposes of R18-2-1404(E) or R18-2-1404(I) regarding the maximum intervals between conformity determinations. Conformity shall be determined according to all the applicable criteria and procedures of R18-2-1409 within three years of the last determination which did not rely on subsection (F)(1).G. Ozone nonattainment areas: 1. The requirements of subsection (B)(1) apply if a serious or above ozone nonattainment area has not submitted the implementation plan revisions which CAA §§ 182(c)(2)(A) and 182(c)(2)(B) require to be submitted to EPA November 15, 1994, even if the area has submitted the implementation plan revision which CAA § 182(b)(1) requires to be submitted to EPA November 15, 1993.2. The requirements of subsection (B)(1) apply if a moderate ozone nonattainment area which is using photochemical dispersion modeling to demonstrate the "specific annual reductions as necessary to attain" required by CAA § 182(b)(1), and which has permission from EPA to delay submission of such demonstration until November 15, 1994, does not submit such demonstration by that date. The requirements of subsection (B)(1) apply in this case even if the area has submitted the 15% emission reduction demonstration required by CAA § 182(b)(1).3. The requirements of subsection (A) apply when the implementation plan revisions required by CAA §§ 182(c)(2)(A) and 182(c)(2)(B) are submitted.H. Nonattainment areas which are not required to demonstrate reasonable further progress and attainment. If an area listed in R18-2-1436 submits a control strategy implementation plan revision, the requirements of subsections (A) and (E) apply. Because the areas listed in R18-2-1436 are not required to demonstrate reasonable further progress and attainment and therefore have no CAA deadline, the provisions of subsection (B) do not apply to these areas at any time.I. If a control strategy implementation plan revision is not submitted to EPA but a maintenance plan required by CAA § 175A is submitted to EPA, the requirements of subsection (A) or (D) apply, with the maintenance plan submission treated as a "control strategy implementation plan revision" for the purposes of those requirements.J. This Section does not become effective until June 1, 1996.Ariz. Admin. Code § R18-2-1428
Adopted effective June 15, 1995 (Supp. 95-2).