Ariz. Admin. Code § 18-15-503

Current through Register Vol. 30, No. 50, December 13, 2024
Section R18-15-503 - Clean Water Planning and Design Assistance
A. Planning and design assistance to a specific wastewater treatment facility shall assist that system to achieve or enhance its legal, financial, technical, or managerial capability to facilitate the design, construction, acquisition, improvement, or consolidation of the wastewater treatment facility. Projects for any other purpose permitted by the Clean Water Act including nonpoint source projects are also eligible. The Board shall approve funds available for planning and design assistance in the annual Clean Water Technical Assistance Intended Use Plan. The Board may determine that no assistance will be offered for the annual funding cycle.
B. To be eligible to receive planning and design assistance under the Clean Water Technical Assistance Program, the applicant shall demonstrate the applicant is eligible under R18-15-201. An eligible applicant shall apply for planning and design assistance on or before a date specified by the Authority and on an application form specified by the Authority.
C. An applicant shall commit to a matching contribution toward the total project cost as specified in the Request for Applications. The matching contribution may include cash contributions or in-kind contributions. The Board may waive or modify the applicant's match requirement according to criteria established in the Request for Applications.
D. The Authority shall solicit, evaluate, and award planning and design assistance in accordance with A.R.S. § 41-2702.
E. The Authority shall evaluate the applications received to determine which projects are eligible under the Clean Water Act, 33 U.S.C. 1381 to 1387. Eligible applications shall specify a demonstrated need of the applicant for assistance in securing financial assistance for development and implementation of a wastewater capital improvement project or stormwater or nonpoint source project.
F. The Authority shall determine planning and design assistance awards based on the amount of funding available. If funding is limited, all eligible projects may not be funded. The Authority shall provide the planning and design assistance award recommendations to the Board for review and approval at a public meeting. The Board may adopt, modify, or reject the Authority's recommendations in whole or in part.
G. Within 30 days after the adoption of the planning and design assistance awards at a public meeting, the Authority shall notify all applicants whether or not they received an award.
H. An unsuccessful applicant may submit an appeal in writing in accordance with A.R.S. § 41-2704.
I. The Authority and the applicant shall enter into a planning and design assistance agreement that shall include at a minimum:
1. A scope of work,
2. The amount awarded,
3. The amount of the local match required,
4. A final project budget and timeline, and
5. Reporting requirements.

J. The Authority shall release proceeds subject to a disbursement request if the request is consistent with the planning and design assistance agreement and the disbursement schedule.
1. The recipient shall request each disbursement on the forms provided by the Authority. Each disbursement request shall include a certification and signature document, a cost-incurred report, and a DBE report. The Authority shall not process a disbursement until the recipient provides a completed disbursement form.
2. The recipient shall include copies of invoices or other documents that show proof of eligible costs incurred with each disbursement request.

Ariz. Admin. Code § R18-15-503

New Section adopted by final rulemaking at 6 A.A.R. 2116, effective May 16, 2000 (Supp. 00-2). Amended by final rulemaking at 7 A.A.R. 5956, effective December 4, 2001 (Supp. 01-4). Amended by final rulemaking at 16 A.A.R. 1709, effective October 9, 2010 (Supp. 10-3). Amended by final rulemaking at 24 A.A.R. 239, effective 3/11/2018.