Current through Register Vol. 30, No. 45, November 8, 2024
Section R18-13-1612 - Accumulation SitesA. PCS from one or more points of generation under the control of a single generator may be accumulated in an accumulation site under the control of that generator for up to 90 days prior to shipment of the PCS to a storage, disposal, or treatment facility.B. An accumulation site shall comply with the storage facility requirements set forth in R18-13-1611, except subsection (A) of that Section. An accumulation site shall not be required to comply with the requirements in R18-13-1607.C. While PCS is at an accumulation site, the owner or operator shall control public access and prevent unauthorized vehicular traffic and illegal dumping. PCS shall be managed to prevent the PCS from being exposed to storm water run-on or run-off.Ariz. Admin. Code § R18-13-1612
Recodified from R18-8-1612 at 8 A.A.R. 5172, effective November 27, 2002 (Supp. 02-4).