Current through Register Vol. 30, No. 44, November 1, 2024
Section R18-13-1202 - Burial of Mining Waste TiresA. The operator shall file with the Director a one-time notice within 24 hours after commencement of burial of mining waste tires consisting of a map of the mining facility that clearly identifies the locations and dimensions of each burial cell and the estimated number of mining waste tires that will be buried in each cell. The operator shall identify each burial cell using an alphabetical or numeric identifier. If a mining facility uses a new burial cell not included in the commencement of burial notice, the operator shall notify the Department within 24 hours after commencement of burial in that cell.B. An operator shall only permit burial of mining waste tires in areas that are, or will be, included in an aquifer protection permit issued for the mining facility. An operator shall not permit burial of mining waste tires in leach areas unless prior to burial the Department issues an aquifer protection permit covering the leach area.C. An operator shall not permit a burial cell to be located within 10 feet of another burial cell.D. An operator shall not permit the burial of mining waste tires unless the tires are waste generated at the mining facility or another mining facility of the same owner.Ariz. Admin. Code § R18-13-1202
Section recodified from A.A.C. R18-8-702, filed in the Office of the Secretary of State September 29, 2000 (Supp. 00-3). Amended by final rulemaking at 7 A.A.R. 5695, effective November 27, 2001 (Supp. 01-4).