Section 3 AAC 52.600 - Applicability, purposes, and waiver(a) The provisions of 3 AAC 52.600 - 3 AAC 52.690 apply to all electric utilities participating in the power cost equalization program established in AS 42.45.100-42.45.190.(b) The purposes of 3 AAC 52.600 - 3 AAC 52.690 are to establish criteria for the determination of power cost equalization per kilowatt-hour and to encourage economic and efficient practices by participating electric utilities.(c) Unless otherwise required under AS 42.05 or AS 42.45, a requirement in 3 AAC 52.600 - 3 AAC 52.690 may be modified or waived, in whole or in part, by order of the commission and a showing of good cause or on the commission's own motion. An applicant shall file and the commission will consider an application in accordance with 3 AAC 48.805. In considering an application, the commission will consider a participating electric utility's size, location, and accessibility, and other local conditions.Eff. 10/28/89, Register 112; am 5/18/96, Register 138; am 9/11/2004, Register 171Authority:AS 42.05.141
AS 42.05.151
AS 42.45.110
AS 42.45.130
AS 42.45.160
AS 42.45.170