3 Alaska Admin. Code § 48.070

Current through May 31, 2024
Section 3 AAC 48.070 - Formal proceedings
(a) Except as otherwise provided by 3 AAC 48.030 and 3 AAC 48.650, an application for a certificate of public convenience and necessity or electric reliability organization certificate or for the revision, sale, lease, rental, or inheritance of a certificate; or for the authority to acquire a controlling interest in a certificated public utility, electric reliability organization, or pipeline carrier; or any other application required by AS 42.05 or AS 42.06, will be docketed and considered in a formal proceeding.
(b) A tariff filing will not be docketed or considered in a formal proceeding unless it is suspended by order of the commission within the statutory notice period, or within the regulatory notice period set under 3 AAC 46.320 for an electric reliability organization.
(c) The commission may institute a formal proceeding in regard to any jurisdictional matter, either on its own motion or on complaint.
(d) An electric reliability organization rule or petition for a new or revised integrated resource plan under AS 42.05.780 will not be docketed or considered in a formal proceeding unless it is suspended by order of the commission within the regulatory notice period set under 3 AAC 46.260 for a new or revised integrated resource plan or 3 AAC 46.470 for an electric reliability organization rule.

3 AAC 48.070

Eff. 1/13/73, Register 44; am 6/29/84, Register 90; am 3/11/2022, Register 241, April 2022

Authority:AS 42.05.141

AS 42.05.151

AS 42.05.171

AS 42.05.241

AS 42.05.261

AS 42.05.271

AS 42.05.281

AS 42.05.770

AS 42.05.140

AS 42.06.260

AS 42.06.290

AS 42.06.300

AS 42.06.340

AS 42.06.400