RCC =VOP/VTOT*(A-L)
where
RCC = the regulatory cost charge;
Vop = the total volume of oil and gas produced from, and oil, gas, water, and other fluids injected into, during the most recently concluded calendar year, wells for which a Permit to Drill has been issued under AS 31.05.090, of which the person is the operator on the first day of the fiscal year, and that have not before that day been plugged and abandoned and reported as abandoned in accordance with this chapter;
VTOT = the total volume of oil and gas produced from, and oil, gas, water, and other fluids injected into, during the most recently concluded calendar year, all wells for which a Permit to Drill has been issued under AS 31.05.090 and that have not before the first day of the fiscal year been plugged and abandoned and reported as abandoned in accordance with this chapter;
A = the appropriation, other than from federal receipts, made for the operating costs of the commission for the fiscal year;
L = the lapsed amount of a previous appropriation that is appropriated for the fiscal year under AS 31.05.093(d).
20 AAC 25.605
Authority:AS 31.05.030
AS 31.05.093