A well may not be completed in more than one pool without approval of the commission. The commission will require evidence of complete separation of flowstreams from separate pools, as ascertained by a pressure test or other acceptable test conducted at the time the packers are set. Subsequently, if packer leakage is suspected, the commission will require the operator to provide proof of complete separation of the pools involved in the completions or make a packer leakage test. At least 24 hours notice must be given so that the packer leakage test may be witnessed by a representative of the commission.
20 AAC 25.210
Authority:AS 31.05.030