Current through October 17, 2024
Section 18 AAC 78.610 - Soil cleanup levels(a) The owner or operator shall ensure that corrective action activities at the site meet applicable soil cleanup levels as determined under 18 AAC 75.340 - 18 AAC 75.341. If the department, as part of its approval of soil cleanup levels under 18 AAC 75.340 and 18 AAC 75.341, determines that compliance with an institutional control is required, the department will make that determination under 18 AAC 78.625.(b) If an analysis of soil samples as required in this chapter shows soil to be contaminated with a hazardous substance other than a petroleum product, the owner or operator is subject to 18 AAC 75 and, as applicable, 18 AAC 60, 18 AAC 62, 18 AAC 70, 18 AAC 72, or another chapter of this title.(c) Except as provided in 18 AAC 75.340(c) - (f), soil at a site where groundwater has been impacted by petroleum leachate must meet the soil cleanup levels in 18 AAC 75.341(a), Table A1, Part B, Category A unless the department approves another soil cleanup level under 18 AAC 75.340.Eff. 1/22/99, Register 149Authority:AS 46.03.020
AS 46.03.050
AS 46.03.365