Current through September 25, 2024
Section 18 AAC 50.306 - Prevention of significant deterioration (PSD) permits(a) An owner or operator must obtain a prevention of significant deterioration (PSD) permit under this section before beginning actual constriction of a new major stationary source, a major modification, or a PAL major modification.(b) To satisfy the requirement of (a) of this section, the owner or operator must comply with the requirements of 40 C.F.R. 52.21, adopted by reference in 18 AAC 50.040 with the following changes: (1) in 40 C.F.R. 52.21,(A) the term "administrator" means(i) "federal administrator" in 40 C.F.R. 52.21(b)(17), (b)(37), (b)(43), (b)(48)(ii) (c), (i)(1)(x), (l)(2), and (p)(2); and(ii) "department" elsewhere;(B) the term "national ambient air quality standard" means an ambient air quality standard set out in 18 AAC 50.010 for this state;(C) the term "ambient air increment" or "maximum allowable increase" means a maximum allowable increase set out in Table 3 in 18 AAC 50.020(b), calculated as described in 18 AAC 50.020;(2) exclusions from increment consumption apply to the maximum extent allowed under 18 AAC 50.215(b) (2);(3) in 40 C.F.R. 52.21(i)(1)(xi), each reference to the date "July 15, 2008" is replaced with "December 9, 2010."(c) The department will issue each permit under this section following the procedures and other requirements of AS 46.14, and of 40 C.F.R. 51.166(f) and (q)(2), and 40 C.F.R. 52.21, as adopted by reference in 18 AAC 50.040, with the following additions and exemptions: (1) the date of receipt of the application is the date that the department has received all required information under AS 46.14.160 and this section;(2) the department will provide at least 30 days for the public to comment, and upon its own motion or upon a request in accordance with 18 AAC 15.060, will hold a public hearing on the application as described in 18 AAC 15.060(d) - (h);(3) if requested by the owner or operator of a stationary source or modification that requires both a PSD permit and a Title V permit or permit modification, the department will integrate review of the operating permit application or amendment required by 18 AAC 50.326 and the PSD permit application required by this section; a PSD permit application designated for integrated review will be processed in accordance with procedures and deadlines described in 18 AAC 50.326.(d) In each PSD permit issued under this section, the department will include terms and conditions (1) as necessary to ensure that the permittee will construct and operate the proposed stationary source or modification in accordance with this section, including terms and conditions consistent with AS 46.14.180 that require the permittee to (A) install, use, and maintain monitoring equipment;(B) sample emissions according to the methods prescribed by the department, at locations and, intervals specified by the department, and by procedures specified by the department;(C) provide source test reports, monitoring data, emissions data, and information from analysis of any test samples;(E) make periodic reports on process operations and emissions, and reports consistent with 18 AAC 50.235 - 18 AAC 50.240; and(2) for payment of fees consistent with 18 AAC 50.400 - 18 AAC 50.420.(e) A person described in AS 46.14.200 may request an adjudicatory hearing to challenge the issuance, denial, or conditions of a PSD permit as prescribed in 18 AAC 15.195 - 18 AAC 15.340.Eff. 10/1/2004, Register 171; am 7/25/2008, Register 187; am 12/9/2010, Register 196; am 1/4/2013, Register 205Authority:AS 46.03.020
AS 46.14.010
AS 46.14.020
AS 46.14.120
AS 46.14.130
AS 46.14.140
AS 46.14.170
AS 46.14.180