15 Alaska Admin. Code § 125.805

Current through December 21, 2024
Section 15 AAC 125.805 - Extension of time and leave to file late

If a person is required by this chapter to respond or take some action within a specified period of time, the agency may grant an extension of time or leave to file late. The agency may grant the extension or leave only upon request and proof of good cause for the failure to comply within the specified period of time.

15 AAC 125.805

Eff. 10/1/98, Register 147; am 2/16/2013, Register 205

Authority:AS 25.27.020