All lands leased for commercial or industrial purposes shall be utilized only for these purposes, and in accordance with applicable building and zoning codes. In the absence of such codes the lessee shall, at least 30 calendar days prior to the commencement of construction or utilization, file with the director a plot plan, a general description of contemplated construction and a brief description of the business proposed. The director shall reject said plan within 30 calendar days of receipt thereof if he deems such utilization or construction contrary to the orderly development of the area or incompatible with existing development.
11 AAC 58.020
Authority:AS 38.05.020
AS 38.05.035
AS 38.05.075