The permittee shall provide the director with a preliminary report within six months after September 1 of each year in which the permit is valid and within six months after completion of the work under the permit. The report shall designate in detail
11 AAC 16.050
Authority:AS 41.21.040
AS 41.35.050
AS 41.35.080