Current through Register Vol. 43, No. 1, October 31, 2024
Section 880-X-12A-.05 - General Program Requirements(1) Operators shall --(a) Designate a certified blaster(s) as blaster(s)-in-charge for each blast to be detonated in surface coal mining and reclamation operations;(b) Ensure that all employees who perform blasting tasks under the supervision of a blaster-in-charge have training in the use and handling of explosives;(c) Limit the size of a blasting crew supervised by a properly certified blaster-in-charge such that the operator ensures that its blaster(s)-in-charge can provide adequate direct supervision to crew members and remain in control of blast design, preparation, and execution so that blasting complies with applicable State and Federal regulations; and(d) Ensure that a blaster-in-charge supervises no more than one crew at any given time.(2) A blaster-in-charge shall -- (a) Ensure that blast design and execution meet standards prescribed in Rules 880-X-10C-.30 - 880-X-10C-.35 or 880-X-10D-.28 - 880-X-10D-.32 and Rule 880-X-12A;(b) Directly supervise blast preparation and execution at the blast site to ensure that such standards are met; and(c) Be present at the site when the blast is detonated.
Author:
Ala. Admin. Code r. 880-X-12A-.05
Statutory Authority:Code of Ala. 1975, §§ 9-16-71, 72, 73, 74, 75, 80, 90, 91.