Current through Register Vol. 43, No. 1, October 31, 2024
Section 480-3-4-.14 - Scaffolds And Platforms(1) Stages, platforms or scaffolds required for work in and around pits or quarries shall be substantially built of sound material. Where wood is used, nothing less than 2-inch material shall be used for flooring.(2) Railings and Toe Boards (a) Permanent elevated platforms and scaffolds shall be provided with standard hand railings and toe boards.(3) Working floors of stages, platforms and scaffolds shall be well kept, and attention shall be paid to reducing the stumbling hazards to a minimum by good housekeeping. Tools, drills, drill steel or other material shall not be left on platforms or scaffolds at the end of the shift. Author: Department of Industrial Relations
Ala. Admin. Code r. 480-3-4-.14
Prior to October 1, 1982, this regulation was designated as General Rule 14.Statutory Authority:Code of Ala. 1975, § 25-2-2(3)