Ala. Admin. Code r. 450-9-3-.13

Current through Register Vol. 43, No. 1, October 31, 2024
Section 450-9-3-.13 - Construction Or Alterations Of An Existing Facility

Any construction or alteration of an existing airport facility shall require the owner to notify the Alabama Department of Aeronautics or the Federal Aviation Administration. The proper form to be submitted ("Federal Aviation Administration Form 7460-1") is available upon request from the Alabama Department of Aeronautics. This notification must be made at least 30 days prior to the proposed construction or alteration. The owner must receive approval of the construction or alteration from the Department or the FAA before construction begins. Airport owners are not required to notify the Department of construction or alteration projects that are being funded in part under the FAA Airport Improvement Program.

(2) Typical types of construction or alteration that require FAA or ADA notification include, but are not limited to, the following:
(a) Runway extensions
(b) Taxiway extension or construction
(c) Hangar construction
(d) Construction of any type on, or in the vicinity of an airport that meets the requirements for notification as described in Federal Aviation Regulations Part 77.13.

Author: ADA

Ala. Admin. Code r. 450-9-3-.13

New Rule: Filed January 28, 1998; effective March 4, 1998.

Statutory Authority:Code of Ala. 1975, §§ 4-2-33, 4-2-37.