Current through Register Vol. 43, No. 1, October 31, 2024
Section 400-3-6-.09 - Production Facilities(1) All production facilities shall be designed, installed, and maintained in accordance with generally accepted industry practices or standards and in a manner which provides for efficiency, safety of operation, and protection of the environment.(2) Prior to placing equipment in service, a generalized schematic flow diagram showing all equipment on location shall be submitted to the Supervisor.(3) For operations within designated field boundaries where well sites and equipment are the same, a typical schematic may be submitted by the operator for that field. Any deviation from the typical schematic should be submitted to the Supervisor. Author: State Oil and Gas Board
Ala. Admin. Code r. 400-3-6-.09
New Rule: Filed April 11, 2000; effective May 16, 2000. Previous Chapter 400-3 (Rules 400-3-X-.01 through 400-3-X-.08) Repealed and New Chapters (400-3-1 through 400-3-6 adopted in lieu thereof: Filed August 7, 1984. Entire Chapter Repealed: Filed January 8, 1992.
Statutory Authority:Code of Ala. 1975, §§ 9-17-1, etseq.