If required by this rule, a directional survey, which may include logging while drilling (LWD) or measurement while drilling (MWD) logs, shall be run and one (1) copy thereof filed by the operator with the Supervisor within thirty (30) days after completion of a well. Directional surveys shall be run from total depth to base of surface casing or the kickoff point, whichever is shallowest, unless otherwise approved by the Supervisor. However, directional surveys to total depth shall be unnecessary in cases where the interval below the survey is less than five hundred (500) feet. In such an instance, a projection of the latest survey shall satisfy Board requirements. Directional surveys shall be run when:
Ala. Admin. Code r. 400-8-1-.52
Author: S. Marvin Rogers
Statutory Authority: 9-17-150 et seq. of the Code of Alabama (1975)