Current through Register Vol. 43, No. 3, December 31, 2024
Section 400-8-1-.48 - [Effective 1/11/2025] Notification of Activities1. Notification Prior to Performance of Activity. A storage operator shall notify the Supervisor prior to performing any of the following activities: a. Setting surface casing;b. Running intermediate or production casing;e. Wireline logging or surveying;i. Initiating a gathering line construction operation.2. Witness of Activities. The Supervisor may send a duly authorized representative to the location to witness activities in section 1 of this rule.3. Notification Subsequent to Occurrence of Activity. An operator shall notify the Supervisor when the following occurs: a. Loss of a radioactive logging source;b. Encountering unexpected wellbore conditions during recompletion or reworking;c. Repairing or replacing damaged gathering lines; andd. Fire, spill, leak, or blow out.Ala. Admin. Code r. 400-8-1-.48
Adopted by Alabama Administrative Monthly Volume XLIII, Issue No. 02, November 27, 2024, eff. 1/11/2025.Author: S. Marvin Rogers
Statutory Authority: 9-17-150 et seq. of the Code of Alabama (1975)