Ala. Admin. Code r. 335-4-6-.05

Current through Register Vol. 43, No. 1, October 31, 2024
Section 335-4-6-.05 - Mobile Processing Facilities
(1) A person operating mobile processing equipment shall obtain a permit from ADEM unless exempt in accordance with 335-4-2-.04(3)(a).
(2) An owner/operator utilizing equipment that is moved between sites or receivers shall notify ADEM, as described in 335-4-1-.03, at least three (3) days prior to movement of the processing equipment to a different location. Each location where mobile processing occurs shall meet the minimum siting requirements found in the owner or operator's permit.
(3) All processed tire material shall be removed from the location for recycling, further processing, or disposal in a SWDF within thirty (30) days of processing. The owner or operator of the mobile processing equipment shall provide ADEM the name and address of each facility or SWDF that will receive the processed tire material for further use or disposal. Shipments of processed tire material shall be manifested in accordance with 335-4-4-.05, unless the processed tire material is placed in a solid waste container that is routinely emptied by a Solid Waste Collector permitted by a County Health Department. If the processed tire material is to be placed in a solid waste container, the processor shall provide the name of the SWDF that will receive the processed tire material for disposal and shall provide a letter from the SWDF stating acceptance of the processed tire material.
(4) Mobile processors shall maintain an operating record as required in 335-4-6-.04 at a location approved by ADEM.
(5) Owners or operators of mobile processing equipment shall report to ADEM each location where the equipment operated, and the number of tires processed. The report shall be submitted by the twentieth (20th) day of each month for the previous month's operations. A report shall be filed as described in 335-4-1-.03, even if the equipment was not utilized during the reporting month.
(6) If mobile processing equipment is operated at a location for more than one hundred-eighty (180) consecutive days, that location shall be considered a scrap tire processing facility and shall be subject to the requirements in 335-4-6-.01 and 335-4-6-.02.

Ala. Admin. Code r. 335-4-6-.05

New Rule: Filed June 30, 2004; effective August 4, 2004.
Amended by Alabama Administrative Monthly Volume XLII, Issue No. 09, June 28, 2024, eff. 8/12/2024.

Author: James L. Bryant. Adam N. Rhodes

Statutory Authority:Code of Alabama 1975, §§ 22-40A-1et seq.