Utility Scale Wind Towers From India: Preliminary Affirmative Countervailing Duty Determination, and Alignment of Final Determination With Final Antidumping Duty Determination

Download PDF
Federal RegisterMar 25, 2021
86 Fed. Reg. 15897 (Mar. 25, 2021)

AGENCY:

Enforcement and Compliance, International Trade Administration, Department of Commerce.

SUMMARY:

The Department of Commerce (Commerce) preliminarily determines that countervailable subsidies are being provided to producers and exporters of utility scale wind towers (wind towers) from India. The period of investigation is April 1, 2019, through March 31, 2020. Interested parties are invited to comment on this preliminary determination.

DATES:

Applicable March 25, 2021.

FOR FURTHER INFORMATION CONTACT:

David Crespo or Melissa Kinter, AD/CVD Operations, Office II, Enforcement and Compliance, International Trade Administration, U.S. Department of Commerce, 1401 Constitution Avenue NW, Washington, DC 20230; telephone: (202) 482-3693 or (202) 482-1413, respectively.

SUPPLEMENTARY INFORMATION:

Background

This preliminary determination is made in accordance with section 703(b) of the Tariff Act of 1930, as amended (the Act). Commerce published the notice of initiation of this investigation on November 16, 2020. On December 28, 2020, Commerce postponed the preliminary determination of this investigation, and the revised deadline is now March 19, 2021. For a complete description of the events that followed the initiation of this investigation, see the Preliminary Decision Memorandum. A list of topics discussed in the Preliminary Decision Memorandum is included as Appendix II to this notice. The Preliminary Decision Memorandum is a public document and is on file electronically via Enforcement and Compliance's Antidumping and Countervailing Duty Centralized Electronic Service System (ACCESS). ACCESS is available to registered users at http://access.trade.gov. In addition, a complete version of the Preliminary Decision Memorandum can be accessed directly at http://enforcement.trade.gov/frn/.

See Utility Scale Wind Towers from India and Malaysia: Initiation of Countervailing Duty Investigations, 85 FR 73019 (November 16, 2020) (Initiation Notice).

See Utility Scale Wind Towers from India and Malaysia: Postponement of Preliminary Determinations in the Countervailing Duty Investigations, 85 FR 84302 (December 28, 2020).

See Memorandum, “Decision Memorandum for the Preliminary Determination of the Countervailing Duty Investigation of Utility Scale Wind Towers from India,” dated concurrently with, and hereby adopted by, this notice (Preliminary Decision Memorandum).

Scope of the Investigation

The product covered by this investigation is wind towers from India. For a complete description of the scope of this investigation, see Appendix I.

Scope Comments

In accordance with the Preamble to Commerce's regulations, the Initiation Notice set aside a period of time for parties to raise issues regarding product coverage, (i.e., scope). No interested party commented on the scope of the investigation as it appeared in the Initiation Notice.

See Antidumping Duties; Countervailing Duties, Final Rule, 62 FR 27296, 27323 (May 19, 1997).

See Initiation Notice.

Methodology

Commerce is conducting this investigation in accordance with section 701 of the Act. For each of the subsidy programs found countervailable, Commerce preliminarily determines that there is a subsidy, i.e., a financial contribution by an “authority” that gives rise to a benefit to the recipient, and that the subsidy is specific.

See sections 771(5)(B) and (D) of the Act regarding financial contribution; section 771(5)(E) of the Act regarding benefit; and section 771(5A) of the Act regarding specificity.

Commerce notes that, in making these findings, it relied, in part, on facts available, and, because it finds that one or more respondents did not act to the best of their ability to respond to Commerce's requests for information, it drew an adverse inference where appropriate in selecting from among the facts otherwise available. For further information, see “Use of Facts Otherwise Available and Adverse Inferences” in the Preliminary Decision Memorandum.

See sections 776(a) and (b) of the Act.

Alignment

As noted in the Preliminary Decision Memorandum, in accordance with section 705(a)(1) of the Act and 19 CFR 351.210(b)(4), Commerce is aligning the final countervailing duty (CVD) determination in this investigation with the final determination in the companion antidumping duty (AD) investigation of wind towers from India based on a request made by the petitioner. Consequently, the final CVD determination will be issued on the same date as the final AD determination, which is currently scheduled to be issued no later than August 2, 2021, unless postponed.

See Petitioner's Letter, “Utility Scale Wind Towers from India: Request to Align Countervailing Duty Investigation Final Determination with Antidumping Duty Investigation Final Determination,” dated March 16, 2021.

All-Others Rate

Sections 703(d) and 705(c)(5)(A) of the Act provide that in the preliminary determination, Commerce shall determine an estimated all-others rate for companies not individually examined. This rate shall be an amount equal to the weighted average of the estimated subsidy rates established for those companies individually examined, excluding any zero and de minimis rates and any rates based entirely under section 776 of the Act.

Commerce calculated an individual estimated countervailable subsidy rate for Vestas Wind Technology India Private Limited (Vestas), the only individually examined exporter/producer in this investigation. Because the rate calculated for Vestas is not zero, de minimis, or based entirely on facts otherwise available, it is the rate assigned to all-other producers and exporters, pursuant to section 705(c)(5)(A)(i) of the Act.

Preliminary Determination

Commerce preliminarily determines that the following estimated countervailable subsidy rates exist:

Company Subsidy rate (percent)
Vestas Wind Technology India Private Limited 3.74
Naiks Brass & Iron Works * 397.16
Nordex India Pvt * 397.16
Prommada Hindustan * 397.16
Suzlon Energy * 397.16
Vinayaka Energy Tek * 397.16
Wish Energy Solutions Pvt Ltd * 397.16
Zeeco India Pvt. Ltd * 397.16
All Others 3.74
* Rate based on adverse facts available.

Suspension of Liquidation

In accordance with section 703(d)(1)(B) and (d)(2) of the Act, Commerce will direct U.S. Customs and Border Protection (CBP) to suspend liquidation of entries of subject merchandise as described in the scope of the investigation section entered, or withdrawn from warehouse, for consumption on or after the date of publication of this notice in the Federal Register. Further, pursuant to 19 CFR 351.205(d), Commerce will instruct CBP to require a cash deposit equal to the rates indicated above.

Disclosure

Commerce intends to disclose its calculations and analysis performed to interested parties in this preliminary determination within five days of its public announcement, or if there is no public announcement, within five days of the date of this notice in accordance with 19 CFR 351.224(b).

Verification

As provided in section 782(i)(1) of the Act, Commerce intends to verify the information relied upon in making its final determination. However, Commerce is currently unable to conduct on-site verification of the information relied upon in making its final determination in this investigation. Accordingly, we intend to take additional steps in lieu of on-site verification. Commerce will notify interested parties of any additional documentation or information required.

Public Comment

Case briefs or other written comments may be submitted to the Assistant Secretary for Enforcement and Compliance. Interested parties will be notified of the timeline for the submission of such case briefs and written comments at a later date. Rebuttal briefs, limited to issues raised in case briefs, may be submitted no later than seven days after the deadline date for case briefs. Pursuant to 19 CFR 351.309(c)(2) and (d)(2), parties who submit case briefs or rebuttal briefs in this investigation are encouraged to submit with each argument: (1) A statement of the issue; (2) a brief summary of the argument; and (3) a table of authorities.

See 19 CFR 351.309; see also 19 CFR 351.303 (for general filing requirements).

Pursuant to 19 CFR 351.310(c), interested parties who wish to request a hearing, limited to issues raised in the case and rebuttal briefs, must submit a written request to the Assistant Secretary for Enforcement and Compliance, U.S. Department of Commerce within 30 days after the date of publication of this notice. Requests should contain the party's name, address, and telephone number, the number of participants, whether any participant is a foreign national, and a list of the issues to be discussed. If a request for a hearing is made, Commerce intends to hold the hearing at a time and date to be determined. Parties should confirm by telephone the date, time, and location of the hearing two days before the scheduled date.

International Trade Commission Notification

In accordance with section 703(f) of the Act, Commerce will notify the International Trade Commission (ITC) of its determination. If the final determination is affirmative, the ITC will determine before the later of 120 days after the date of this preliminary determination or 45 days after the final determination.

Notification to Interested Parties

This determination is issued and published pursuant to sections 703(f) and 777(i) of the Act, and 19 CFR 351.205(c).

Dated: March 19, 2021.

Christian Marsh,

Acting Assistant Secretary for Enforcement and Compliance.

Appendix I

Scope of the Investigation

The merchandise covered by this investigation consists of certain wind towers, whether or not tapered, and sections thereof. Certain wind towers support the nacelle and rotor blades in a wind turbine with a minimum rated electrical power generation capacity in excess of 100 kilowatts and with a minimum height of 50 meters measured from the base of the tower to the bottom of the nacelle (i.e., where the top of the tower and nacelle are joined) when fully assembled.

A wind tower section consists of, at a minimum, multiple steel plates rolled into cylindrical or conical shapes and welded together (or otherwise attached) to form a steel shell, regardless of coating, end-finish, painting, treatment, or method of manufacture, and with or without flanges, doors, or internal or external components (e.g., flooring/decking, ladders, lifts, electrical buss boxes, electrical cabling, conduit, cable harness for nacelle generator, interior lighting, tool and storage lockers) attached to the wind tower section. Several wind tower sections are normally required to form a completed wind tower.

Wind towers and sections thereof are included within the scope whether or not they are joined with nonsubject merchandise, such as nacelles or rotor blades, and whether or not they have internal or external components attached to the subject merchandise.

Specifically excluded from the scope are nacelles and rotor blades, regardless of whether they are attached to the wind tower. Also excluded are any internal or external components which are not attached to the wind towers or sections thereof, unless those components are shipped with the tower sections.

Merchandise covered by this investigation is currently classified in the Harmonized Tariff Schedule of the United States (HTSUS) under subheading 7308.20.0020 or 8502.31.0000. Wind towers of iron or steel are classified under HTSUS 7308.20.0020 when imported separately as a tower or tower section(s). Wind towers may be classified under HTSUS 8502.31.0000 when imported as combination goods with a wind turbine (i.e., accompanying nacelles and/or rotor blades). While the HTSUS subheadings are provided for convenience and customs purposes, the written description of the scope of this investigation is dispositive.

Appendix II

List of Topics Discussed in the Preliminary Decision Memorandum

I. Summary

II. Background

III. Scope Comments

IV. Scope of the Investigation

V. Injury Test

VI. Subsidies Valuation

VII. Use of Facts Otherwise Available and Adverse Inferences

VIII. Analysis of Programs

IX. Recommendation

[FR Doc. 2021-06196 Filed 3-24-21; 8:45 am]

BILLING CODE 3510-DS-P