PE Hydro Generation, LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

Download PDF
Federal RegisterNov 9, 2016
81 Fed. Reg. 78802 (Nov. 9, 2016)

Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.

a. Type of Application: Major License.

b. Project No.: 2343-086.

c. Date filed: December 30, 2015.

d. Applicant: PE Hydro Generation, LLC.

e. Name of Project: Millville Hydroelectric Project.

f. Location: The existing project is located on the Shenandoah River, near the town of Harpers Ferry in Jefferson County, West Virginia. No federal lands are occupied by project works or located within the project boundary.

g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).

h. Applicant Contact: John Collins, Executive Vice President, Cube Hydro Partners, LLC, 2 Bethesda Metro Center, Suite 1330, Bethesda, MD 20814; Telephone—(240) 482-2703.

i. FERC Contact: Michael Spencer, (202) 502-6093, or michael.spencer@ferc.gov.

j. Deadline for filing motions to intervene and protests, comments, recommendations, preliminary terms and conditions, and preliminary prescriptions: 60 Days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice.

The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, recommendations, preliminary terms and conditions, and preliminary fishway prescriptions using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ ecomment.asp . You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P-2343-086.

The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

k. This application has been accepted for filing and is now ready for environmental analysis.

l. The Millville project consists of: (1) A 14.0-foot-high concrete and stone dam consisting of three sections: a 36-foot-long non-overflow abutment on the east bank; an 813-foot long, non-gated spillway section; and a 122-foot-long intake structure, equipped with four vertical lift gates and one canal gate, and extending to the west riverbank; (2) a 100 acre reservoir with gross storage capacity of 900 acre-feet at elevation 324.0 mean sea level; (3) a 1,600-foot-long, 30-foot-wide, 12-foot-high masonry and concrete sided headrace canal; (4) a 125-foot-long, 40-foot-wide brick powerhouse containing 3 turbine-generating units with a combined capacity of 2.84 megawatts; (5) a 550-foot-long tailrace, excavated in bedrock and returning flow to the river channel; and (6) a 1,006-foot-long, 2.4 kilovolt (kV) transmission line to a transformer, with a 794-foot-long, 34.5 kV transmission line to the interconnection with the local grid.

m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above.

Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.

n. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

All filings must (1) bear in all capital letters the title “PROTEST”, “MOTION TO INTERVENE”, “COMMENTS,” “REPLY COMMENTS,” “RECOMMENDATIONS,” “PRELIMINARY TERMS AND CONDITIONS,” or “PRELIMINARY FISHWAY PRESCRIPTIONS;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

o. Procedural Schedule:

The application will be processed according to the following revised Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate.

Milestone Target date
Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions January, 2016.
Commission issues EA May, 2017.
Comments on EA or EIS June, 2017.
Modified terms and conditions August, 2017.

p. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of this notice.

q. A license applicant must file no later than 60 days following the date of issuance of the notice of acceptance and ready for environmental analysis provided for in 5.22: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification.

Dated: November 2, 2016.

Nathaniel J. Davis, Sr.,

Deputy Secretary.

[FR Doc. 2016-26992 Filed 11-8-16; 8:45 am]

BILLING CODE 6717-01-P