One-Time Deauthorization of Water Resources Projects

Download PDF
Federal RegisterOct 7, 2015
80 Fed. Reg. 60647 (Oct. 7, 2015)

AGENCY:

Army Corps of Engineers, DoD.

ACTION:

Notice of Interim Deauthorization List.

SUMMARY:

The U.S. Army Corps of Engineers is publishing an Interim Deauthorization List of water resources development projects and separable elements that have been identified for deauthorization in accordance with section 6001(c) of the Water Resources Reform and Development Act of 2014, Public Law 113-121, 128 STAT. 1346-1347 (WRRDA 2014), and is soliciting comments from the public on the list for 90 calendar days. Comments should be provided to the contact named below by January 4, 2016.

FOR FURTHER INFORMATION CONTACT:

Mr. Joseph W. Aldridge, Headquarters, U.S. Army Corps of Engineers, Attention: CECW-IP, Washington, DC 20314-1000. Tel. (202) 761-4130 or joseph.w.aldridge@usace.army.mil.

SUPPLEMENTARY INFORMATION:

Interim Deauthorization List required by § 6001(c).

Section 6001(c) provides that the Secretary shall develop an Interim Deauthorization List that identifies each water resources development project, or separable element of a project, that meets the following criteria. Projects and separable elements eligible for deauthorization are those uncompleted construction projects and separable elements meeting all of the following criteria: (1) They were authorized for construction before November 8, 2007, or their most recent modification of the construction authorization predates November 8, 2007; (2) their construction has not been initiated, or, if construction has been initiated, there have been no obligations of Federal or non-federal funds for construction in the current fiscal year or any of the past 6 fiscal years; and, (3) there has been no funding for a post-authorization study in the current fiscal year or any of the past 6 fiscal years. As specifically provided in section 6001(f)(1)(B) of WRRDA 2014, water resources development projects include environmental infrastructure assistance projects and programs of the U.S. Army Corps of Engineers. In accordance with section 103(f) of the Water Resources Development Act of 1986, separable elements is defined as “a portion of a project—

(1) which is physically separable from other portions of the project; and

(2) which—

(A) achieves hydrologic effects, or

(B) produces physical or economic benefits, which are separately identifiable from those produced by other portions of the project.”

The following elements of an authorized water resources development project also qualify as separable elements: An element for which there is an executed design agreement or project partnership agreement specific to that element; an element that has received funding specified for that element; an element that was authorized separately from or as an amendment to the authorization for the remainder of the water resources development project, that was separately identified in the authorization for the water resources development project, or for which a statute specifies an authorized cost, estimated cost, or amount authorized to be appropriated; an element that has been placed in service or for which the Government or the non-federal partner has assumed operation and maintenance; an element that has been deauthorized; or the remaining portion of the water resources development project apart from other separable elements. Following a 90-day public review period of the Interim Deauthorization List, the Assistant Secretary of the Army for Civil Works (ASA(CW)) will publish a Final Deauthorization List in the Federal Register. Section 6001(d)(2)(A) of WRRDA 2014 requires that the Secretary shall include on the Final Deauthorization List projects and separable elements of projects that have, in the aggregate, an estimated Federal cost to complete that is at least $18 billion. The ASA(CW) has strived to meet the requirements of Section 6001, but was not able to identify projects that totaled $18 billion.

The projects and elements on the Final Deauthorization List will be deauthorized automatically after 180 days following the date that the ASA(CW) submits the Final Deauthorization List to Congress, unless the Congress passes a joint resolution disapproving the Final Deauthorization List or the non-Federal interest for the project or separable element of the project provides sufficient funds to complete the project or separable element. The amount shown as the Federal Balance to complete is a working estimate generally based on the authorization and as such any non-Federal interests considering providing sufficient funds to complete a project or separable element should contact the appropriate District Commander to discuss the process necessary to develop a final cost to complete a project or separable element.

The Interim Deauthorization List follows below in Table 1.

Table 1 (Interim Deauthorization List)

State Business line Corps district Congressional districts Project/element name Project/element type Public law of authorization or latest amendment Section of public law Project/element phase and status Latest fiscal year of federal or non-federal obligations for construction Federal balance to complete (subject to Section 902 where applicable)
AL NAV SAM AL 2, 3 & 4 ALABAMA-COOSA RIVER AND TRIBUTARIES, AL (COOSA RIVER BETWEEN MONTGOMERY AND GADSDEN) PROJECT 99-662 813 CONSTRUCTION NOT INITIATED 1986 $3,781,921,691
AL EI SAM AL 4 DUCK RIVER, AL PROJECT 106-554 108a CONSTRUCTION NOT INITIATED NO OBLIGATION FOR CONSTRUCTION 5,000,000
AR EI MVK AR 4 UNION COUNTY, AR PROJECT 106-554 108d CONSTRUCTION NOT INITIATED 2008 51,247,100
AR FRM MVM AR 1 L'ANGUILLE RIVER BASIN, AR PROJECT 99-662 103 CONSTRUCTION NOT INITIATED 2004 19,466,768
AR FRM SWL AR 1, 2, 3 & 4; OK 1 ARKANSAS RIVER LEVEES, AR PROJECT 101-640 110(a1) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 591,605
AR AER SWL AR 3 BEAVER DAM , AR (TROUT PRODUCTION CENTER) SEPARABLE ELEMENT 94-587 105 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 5,990,000
AR EI SWL AR 3 BEAVER LAKE, BENTON/WASH, AR SEPARABLE ELEMENT 104-303 523 CONSTRUCTION PAUSED 2002 5,000,000
CA EI SPK CA 4 CALAVERAS COUNTY, CA PROJECT 104-303 526 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,500,000
CA EI SPK CA 3 & 5 CLEAR LAKE BASIN, CA PROJECT 106-554 108a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
CA FRM SPK CA 3 COLUSA TROUGH DRAINAGE CANAL, SACRAMENTO RIVER AND TRIBUTARIES, CA PROJECT 99-662 830 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 18,900,846
CA EI SPK CA 21 PINE FLAT DAM, CA PROJECT 106-541 101b(7) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 41,502,918
CA EI SPL CA 39 CHINO HILLS, CA PROJECT 106-554 108a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
CA EI SPL CA 39 & 45 EASTERN MUNICIPAL WATER DISTRICT, CA PROJECT 106-554 108a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
CA FRM SPL CA 24 GOLETA & VICINITY, CA PROJECT 102-580 102b CONSTRUCTION PAUSED 1984 1,233,626
CA EI SPL CA 44 LOS ANGELES HARBOR/TERMINAL ISLAND, CA PROJECT 106-554 108d NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 6,500,000
CA FRM SPL CA 24 LOWER MISSION CREEK, CA PROJECT 100-676 3a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 14,625,971
CA EI SPL CA 26, 27 & 29 SAN DIEGO AREA WATER REUSE DEMOSTRATION FACILITIES, CA PROJECT 102-580 217c(2) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 5,000,000
CA EI SPL CA 52 SAN DIEGO COUNTY, CA (CORONADO TRANSBAY WASTEWATER PIPELINE) PROJECT 106-554 108d NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 10,000,000
CA EI SPL CA 26, 27 & 29 SOUTHERN CALIFORNIA COMPREHENSIVE WATER REUSE SYSTEM, CA PROJECT 102-580 217c(1) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 5,000,000
CT EI NAE CT 4 BRIDGEPORT COMBINED SEWER OVERFLOW PTOJECT, CT PROJECT 106-53 502b CONSTRUCTION NOT INITIATED NO OBLIGATION FOR CONSTRUCTION 10,000,000
CT EI NAE CT 1 HARTFORD, CT PROJECT 106-53 502b NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 10,000,000
CT EI NAE CT 3 NEW HAVEN, CT PROJECT 106-53 502b NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 10,000,000
CT, ME, MA, NH, RI & VT AER NAE CT 1, 2, 3, 4 & 5; ME 1, & 2; MA 1, 2, 3, 4, 5, 6, 7, 8, & 9; NH 1 & 2; RI 1 & 2; VT AT LARGE NEW ENGLAND WATER RESOURCES AND ECOSYSTEM RESTORATION, CT, ME, MA, NH, RI & VT PROJECT 106-541 507 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION (3)0
DC & MD EI NAB WASHINGTON DC AND MARYLAND, D.C. & MD PROJECT 106-554 108d CONSTRUCTION NOT INITIATED 1998 14,807,000
FL AER SAJ FL 17, 18, 19, 20, 21, 22 & 23 COMPREHENSIVE EVERGLADES RESTORATION PLAN, FL (LAKE BELT GROUND RESERVOIR TECHNOLOGY) SEPARABLE ELEMENT 106-541 601 b2biiii CONSTRUCTION NOT INITIATED 2005 17,000,000
FL AER SAJ FL 17, 18, 20, 21, 22, 23, 25, 26 & 27 COMPREHENSIVE EVERGLADES RESTORATION PLAN, FL (NORTH NEW RIVER IMPROVEMENTS) SEPARABLE ELEMENT 106-541 601 b2cix NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 67,150,000
FL AER SAJ FL 18, 20, 21, 22, 23, 24, 25, 26 & 27 COMPREHENSIVE EVERGLADES RESTORATION PLAN, FL (RAISE AND BRIDGE EAST PORTION OF TAMIAMI TRAIL AND FILL MIAMI CANAL WITHIN WATER) (CONSEVATION AREA 3) SEPARABLE ELEMENT 106-541 601 b2cviii NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 21,500,000
FL AER SAJ FL 16 & 23 COMPREHENSIVE EVERGLADES RESTORATION PLAN, FL (TAYLOR CREEK/NUBBIN SLOUGH STORAGE AND TREATMENT AREA) SEPARABLE ELEMENT 106-541 601 b2cvii CONSTRUCTION NOT INITIATED NO OBLIGATION FOR CONSTRUCTION 67,800,000
FL AER SAJ FL 17, 18, 20, 21, 22, 23, 25, 26 & 27 COMPREHENSIVE EVERGLADES RESTORATION PLAN, FL (WASTEWATER REUSE TECHNOLOGY) SEPARABLE ELEMENT 106-541 601 b2biiii CONSTRUCTION NOT INITIATED 2005 20,500,000
FL NAV SAJ FL 12 HUDSON RIVER, FL PROJECT 81-516 101 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 3,650,000
FL EI SAJ FL 27 KEY BISCAYNE, FL PROJECT 106-554 108a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
FL FRM SAJ FL 14 LITTLE TALBOT ISLAND, FL PROJECT 106-53 101b7 CONSTRUCTION PAUSED 2000 6,786,030
FL EI SAJ FL 14 SOUTH TAMPA, FL PROJECT 106-554 108a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
FL NAV SAJ FL 10, 11, 12 & 13 TAMPA HARBOR, ALAFIA RIVER, FL PROJECT 106-554 107 CONSTRUCTION NOT INITIATED 2006 64,771,847
FL NAV SAJ FL 10, 11, 12 & 13 TAMPA HARBOR, FL ((PORT SUTTON TURNING BASIN) WIDENING TO AN ADDITIONAL 105 FEET TO THE FENDER LINE ALONG PENDOLA POINT) SEPARABLE ELEMENT 99-662 858 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 8,434,881
HI FRM POH HI 1 WAIKIKI EROSION CONTROL, HI PROJECT 89-298 301 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 16,584,000
IL EI LRC IL 11 & 14 AURORA, IL PROJECT 106-554 108d NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 8,000,000
IL FRM LRC IL 9, 10 & 14 DES PLAINES RIVER, IL (NORTH FORK MILL CREEK DAM MODIFICATION) SEPARABLE ELEMENT 106-53 101b10 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 5,795,400
IN EI LRE IN 3 FORT WAYNE, IN PROJECT 106-554 108a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,529,324
IN EI LRL IN 7 INDIANAPOLIS, IN PROJECT 106-554 108a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
KY FRM LRH KY 5 BEAVER CREEK BASIN, KY PROJECT 89-298 204 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 20,873,500
KY & TN AER MVM TN 8; KY 1 REELFOOT LAKE, TN & KY PROJECT 106-53 101b11 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 33,072,769
LA FRM MVK LA 1 PEARL RIVER, SLIDELL, SAINT TAMMANY PARISH, LA PROJECT 99-662 401b CONSTRUCTION NOT INITIATED 2002 29,311,000
LA FRM MVN LA 1, 2 & 6 AMITE RIVER AND TRIBUTARIES, LA PROJECT 102-580 101(11) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 38,058,405
LA FRM MVN LA 6 BAYOU COCODRIE AND TRIBUTARIES, LA PROJECT 93-251 87 CONSTRUCTION PAUSED 1987 345,472,000
LA NAV MVN LA 1, 2, 3 & 6 GULF INTRACOASTAL WATERWAY, LA-TX SECTION, LA & TX PROJECT 87-874 101 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 201,422,000
LA EI MVN LA 1 & 2 KENNER, LA PROJECT 106-554 108 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 5,000,000
LA EI MVN LA 1 & 2 ST. CHARLES, ST. BERNARD, AND PLAQUEMINES PARISHES, LA PROJECT 106-554 108a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
LA EI MVN LA 2 & 6 ST. JOHN THE BAPTIST AND ST. JAMES PARISHES, LA PROJECT 106-554 108a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
LA FRM MVN LA 1 TANGIPAHOA, TCHEFUNCTE, AND TICKFAW RIVERS, LA PROJECT 99-662 401 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 21,723,000
MA EI NAE MA 9 FALL RIVER AND NEW BEDFORD, MA PROJECT 106-554 108c NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 35,000,000
MA FRM NAE MA 4, 7 & 8 MUDDY RIVER, BROOKLINE AND BOSTON, MA (AQUATIC ECOSYSTEM RESTORATION FEATURES) SEPARABLE ELEMENT 106-541 522 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 24,050,000
MI NAV LRE MI 1 ALPENA HARBOR, MI (25 FOOT CHANNEL) PROJECT 104-303 363d NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 4,063,120
MI NAV LRE MI 5 BAY CITY, MI PROJECT 101-640 105 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 8,466,275
MI EI LRE MI 6 BENTON HARBOR, ST JOSEPH WASTEWATER TREATMENT PLANT, ST JOSEPH, MI PROJECT 106-554 108d NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,500,000
MI NAV LRE MI 1 CHARLEVOIX, MI (REVETMENT CONNECTION) SEPARABLE ELEMENT 106-53 373 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 52,500
MI NAV LRE MI 1 ONTONAGON HARBOR, ONTONAGON COUNTY MI PROJECT 104-303 363e NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 37,134,623
MI FRM LRE MI 5 SAGINAW RIVER AND TRIBUTARIES, MI (CASS RIVER AT VASSAR) SEPARABLE ELEMENT 106-53 364(3) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 13,909,394
MI FRM LRE MI 4 & 5 SAGINAW RIVER AND TRIBUTARIES, MI (CURTIS ROAD BRIDGE) SEPARABLE ELEMENT 99-662 845 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 720,653
MI FRM LRE MI 5 SAGINAW RIVER AND TRIBUTARIES, MI (FLINT RIVER AT FLINT) SEPARABLE ELEMENT 104-303 329 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 571,781
MI FRM LRE MI 4 & 5 SAGINAW RIVER AND TRIBUTARIES, MI (SHIAWASSEE FLATS) SEPARABLE ELEMENT 106-53 364(4) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 106,825,583
MI, MN & WI NAV LRE MI 1; MN 8; WI 7 GREAT LAKES CONNECTING CHANNELS & HARBORS, MN, MI & WI PROJECT 101-640 101a15 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 17,938,174
MN NAV LRE MN 8 DULUTH, MN (ALTERNATIVE TECHNOLOGY PROJECT) PROJECT 104-303 541a/b NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,000,000
MN EI LRE MN 8 LAKE SUPERIOR CENTER, MN PROJECT 104-303 542 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 10,000,000
MN EI MVP MN 5 MISSISSIPPI PLACE, MN PROJECT 106-53 577 CONSTRUCTION NOT INITIATED 2006 2,968,178
MN & WI NAV LRE MN 8; WI 7 DULUTH—SUPERIOR CHANNEL EXTENSION, MN & WI PROJECT 99-662 201a CONSTRUCTION PAUSED 1995 14,064,481
MO EI NWK MO 4 & 6 KANSAS CITY, MO PROJECT 106-53 502b NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 15,000,000
MO & IL NAV MVS MO 1, 2, 3, & 8; IL 12 & 13 ST LOUIS HARBOR, MO & IL PROJECT 99-662 601a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 43,253,100
MS FRM MVK MS 2 YAZOO BASIN, TRIBUTARIES, MS PROJECT 89-298 204 CONSTRUCTION PAUSED 2007 233,490,728
MS NAV MVK MS 2 YAZOO RIVER, MS (SHEPARDSTOWN BRIDGE) SEPARABLE ELEMENT 99-662 822 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 2,011,094
MS & LA AER MVN LA 2 MISSISSIPPI AND LOUISIANA ESTUARINE AREAS, MS & LA PROJECT 100-676 3(a)8 CONSTRUCTION NOT INITIATED 2003 70,668,540
NC EI SAW NC 8 LUMBERTON, NC PROJECT 106-53 502b NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,700,000
NC EI SAW NC 8 & 9 UNION COUNTY, NC PROJECT 106-554 108a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
NC & SC FRM SAW NC 9 & 12 SUGAR CREEK BASIN, NC & SC PROJECT 99-662 401a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 54,523,100
NH EI NAE NH 2 NASHUA, NH (COMBINED SEWER OVERFLOW) PROJECT 106-53 502b CONSTRUCTION NOT INITIATED NO OBLIGATION FOR CONSTRUCTION 19,853,000
NH EI NAE NH 1 ROCHESTER, NH PROJECT 104-303 504(e) (4) CONSTRUCTION NOT INITIATED NO OBLIGATION FOR CONSTRUCTION 10,897,120
NJ EI NAN NJ 8 ELIZABETH, NJ PROJECT 106-53 502(f) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 20,000,000
NJ EI NAN NJ 8 NORTH HUDSON, NJ PROJECT 106-53 502(f) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 20,000,000
NJ EI NAN NJ 9 PATTERSON AND PASSAIC COUNTY, NJ PROJECT 106-554 108c NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 30,000,000
NJ EI NAP NJ 4, 6 & 12 STATE OF NEW JERSEY AND NEW JERSEY WASTEWATER TREATMENT TRUST, NJ PROJECT 102-580 219c (10) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
NJ EI NAP NJ 5 TOWN OF NEWTON, NJ PROJECT 106-554 108d NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 7,000,000
NV FRM SPL NV 4 LAS VEGAS WASH AND TRIBUTARIES, NV PROJECT 102-580 101(13) CONSTRUCTION NOT INITIATED NO OBLIGATION FOR CONSTRUCTION 3,360,938
NV FRM SPL NV 4 LAS VEGAS, NV PROJECT 109-103 115 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 20,000,000
NY EI LRB NY26 & 27 ERIE COUNTY, BUFFALO AMHRST, NY SEPARABLE ELEMENT 102-580 221 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 7,000,000
NY EI LRB NY 26 & 27 ERIE COUNTY, NY (SLUDGE DISPOSAL) PROJECT 102-580 219c (12) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
NY EI LRB NY 26 & 27 ERIE COUNTY, NY (WATER QUALITY TUNNEL) PROJECT 102-580 219c (11) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
NY EI LRB NY26 & 27 LEWISTON STORMWATER, NY SEPARABLE ELEMENT 102-580 222 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 200,000
NY EI LRB NY 24 LIVERPOOL, NY PROJECT 106-554 108d NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 2,000,000
NY EI NAN NY 10 & 11; NJ 8 INNER HARBOR PROJECT, NEW YORK, NY PROJECT 106-53 502(f) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 15,000,000
NY FRM NAN NY 17, 18, 19 & 20 LOWER HUDSON RIVER & TRIBUTARIES, NY PROJECT 106-53 212e NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 30,000,000
NY EI NAN NY 6 & 11 OUTER HARBOR PROJECT, NEW YORK, NY PROJECT 106-53 502(f) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 15,000,000
NY/NJ NAV NAN NJ 6, 9 & 13; NY 7, 8, 9, 12, 13,14 & 15 NEW YORK HARBOR COLLECTION AND REMOVAL OF DRIFT, NY & NJ PROJECT 101-640 102 CONSTRUCTION PAUSED 2005 201,549,768
OH NAV LRB OH 9 OTTAWA RIVER HARBOR, OH PROJECT 101-640 107a7 CONSTRUCTION NOT INITIATED 2006 13,218,200
OH FRM LRH OH 15 HOCKING RIVER, LOGAN, OH PROJECT 99-662 401a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 16,282,709
OH FRM LRL OH 8 MIAMI RIVER BASIN, PLEASANT RUN, VICINITY FAIRFIELD, OH PROJECT 99-662 401a CONSTRUCTION NOT INITIATED NO OBLIGATION FOR CONSTRUCTION 18,041,480
OK HYD SWT OK 2 FORT GIBSON LAKE, OK (POWER UNITS 5 & 6) SEPARABLE ELEMENT 99-662 601a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 45,485,000
OR EI NWP OR 1 ASTORIA, OR PROJECT 106-53 502b NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 5,000,000
OR EI NWP OR 2 HOOD RIVER, OR PROJECT 106-554 108a (36) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
OR EI NWP OR 2 MEDFORD, OR PROJECT 106-554 108a (37) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
OR EI NWP OR 1 & 2 PORTLAND, OR PROJECT 106-554 108a (38) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
PA EI LRP PA 5 COUDERSPORT, PA PROJECT 106-554 108 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
PA EI LRP PA 18 FINDLAY TOWNSHIP, PA PROJECT 106-53 502 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 11,000,000
PA EI LRP PA 9 GREENSBORO AND GLASSWORKS, PA PROJECT 102-580 219c(15) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,543,324
PA EI LRP PA 9 JEFFERSON TOWNSHIP, GREENE COUNTY, PA PROJECT 106-53 502 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,000,000
PA EI LRP PA 18 NORTH FAYETTE TOWNSHIP, ALLEGHENY COUNTY, PA PROJECT 106-53 502 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 500,000
PA EI LRP PA 18 ROBINSON TOWNSHIP, PA PROJECT 106-53 502 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,200,000
PA EI LRP PA 14 SPRINGDALE BOROUGH, PA PROJECT 106-53 502 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 500,000
PA EI LRP PA 3 TITUSVILLE, PA PROJECT 106-554 108 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 7,300,000
PA EI LRP PA 9, 12, 14 & 18 WASHINGTON, GREENE, WESTMORELAND, AND FAYETTE COUNTIES, PA PROJECT 106-554 108 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 8,000,000
PA EI NAB PA 10 BRADFORD AND SULLIVAN COUNTIES, PA SEPARABLE ELEMENT 106-53 548 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 13,000,000
PA EI NAB PA 11 & 15 DAUPHIN COUNTY, PA PROJECT 106-53 502b NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 2,000,000
PA EI NAB PA 4 DILLSBURG BOROUGH AUTHORITY, PA PROJECT 106-53 502b NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 2,000,000
PA EI NAB PA 4 HAMPDEN TOWNSHIP, PA PROJECT 106-53 502b NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 3,000,000
PA EI NAB PA 4 & 11 MOUNT JOY TOWNSHIP AND CONEWAGO TOWNSHIP, PA PROJECT 106-554 108d NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 8,300,000
PA EI NAB PA 5 PATTON TOWNSHIP, PA PROJECT 106-53 502b NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,400,000
PA EI NAB PA 4 UPPER ALLEN TOWNSHIP, PA PROJECT 106-53 502b NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 3,400,000
PA FRM NAP PA 17 DELAWARE RIVER BASIN—WABASH CREEK, BOROUGH OF TAMAQUA, PA PROJECT 93-251 2 CONSTRUCTION NOT INITIATED 1993 13,194,000
PA FRM NAP PA 2 & 3 PHILADELPHIA, PA (FRANKFORD DAM) PROJECT 104-303 564e NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 900,000
PA FRM NAP PA 1, 2, 3 & 13 PHILADELPHIA, PA (PENNYPACK PARK) PROJECT 104-303 564d NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 15,000,000
PA FRM NAP PA 2 & 3 PHILADELPHIA, PA (WATER WORKS RESTORATION) PROJECT 104-303 564a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,000,000
PA EI NAP PA 6 PHOENIXVILLE BOROUGH, CHESTER COUNTY, PA PROJECT 106-554 108d NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 2,400,000
PA EI NAP PA 8 TOWAMENCIN TOWNSHIP, PA PROJECT 106-53 502b CONSTRUCTION NOT INITIATED 2005 1,462,000
PR FRM SAJ PR AT LARGE GUANAJIBO RIVER, PR PROJECT 106-53 101 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 33,495,941
PR FRM SAJ PR AT LARGE RIO NIGUA AT SALINAS, PR PROJECT 106-53 101 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 12,145,000
RI EI NAE RI 2 CRANSTON, RI PROJECT 101-640 54 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 6,000,000
RI EI NAE RI 1 & 2 DREDGING OF SALT PONDS IN THE STATE OF RHODE ISLAND, RI PROJECT 106-53 578 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 1,100,000
SC EI SAC SC 1 CHARLESTON, SC PROJECT 108-137 127 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 10,000,000
TN NAV MVM TN 9 MEMPHIS HARBOR, MEMPHIS, TN PROJECT 106-53 364 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 110,044,000
TN FRM MVM TN 8 NONCONNAH CREEK, TN & MS (EXTENSION) SEPARABLE ELEMENT 106-541 334 CONSTRUCTION NOT INITIATED 2004 36,188,000
TX FRM SWF TX 8 & 17 NAVASOTA RIVER BASIN, TX (MILLICAN LAKE, TX) SEPARABLE ELEMENT 90-483 203 CONSTRUCTION NOT INITIATED 1983 778,421,000
TX FRM SWF TX 2, 8 & 14 TRINITY RIVER AND TRIBUTARIES, TX (LIBERTY LOCAL PROTECTION PROJECT) SEPARABLE ELEMENT 108-447 116 CONSTRUCTION NOT INITIATED 1981 19,985,000
TX NAV SWF TX 2, 8 & 14 TRINITY RIVER AND TRIBUTARIES, TX (NAVIGATION CHANNEL ABOVE LIBERTY) SEPARABLE ELEMENT 108-447 116 CONSTRUCTION NOT INITIATED 1981 5,412,060,000
TX FRM SWF TX 2, 8 & 14 TRINITY RIVER AND TRIBUTARIES, TX (WEST FORK FLOODWAY) SEPARABLE ELEMENT 108-447 116 CONSTRUCTION NOT INITIATED 1981 119,408,000
TX FRM SWG TX 2, 7, 8, 10, 18 & 29 BUFFALO BAYOU AND TRIBUTARIES, TX (HALLS BAYOU) SEPARABLE ELEMENT 101-640 101(21) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 112,536,000
TX FRM SWG TX 15 & 34 LOWER RIO GRANDE BASIN, TEXAS (SOUTH MAIN CHANNEL), TX SEPARABLE ELEMENT 99-662 401a CONSTRUCTION NOT INITIATED 2005 207,183,000
TX & OK NAV SWT TX 4; OK 2 RED RIVER WATERWAY (BANK STABILIZATION FEATURES) SEPARABLE ELEMENT 90-483 101 CONSTRUCTION NOT INITIATED 2004 685,324,228
UT EI SPK UT 1 CACHE COUNTY, UT PROJECT 106-53 502b NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 5,000,000
UT FRM SPK UT 4 UPPER JORDAN RIVER, UT PROJECT 106-53 357 CONSTRUCTION NOT INITIATED 2004 11,087,268
VA FRM LRH VA 9 LEVISA AND TUG FORKS AND UPPER CUMBERLAND RIVER VA, WV, KY (HAYSI LAKE, VA) SEPARABLE ELEMENT 104-303 353 CONSTRUCTION NOT INITIATED 1989 185,915,319
VA NAV NAO VA 3 NORFOLK HARBOR ANCHORAGES, VA PROJECT 101-640 107a13 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 63,130,000
VA FRM NAO VA 2 WALLOPS ISLAND, VA PROJECT 106-53 567 NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 8,000,000
WA REC NWW WA 5 SNAKE RIVER INTERPRETIVE CENTER, CLARKSTON, WA PROJECT 108-137 124 CONSTRUCTION NOT INITIATED 2004 3,750,044
WA AER NWS WA 1 & 2 STILLAGUMAISH RIVER BASIN, WA PROJECT 106-541 101b (27) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 26,047,966
WV FRM LRH WV 2 CABIN CREEK LPP, WV PROJECT 99-662 601a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 10,409,900
WV FRM LRH WV 3 ISLAND CREEK BASIN, VICINITY OF LOGAN, WV (NON-STRUCTURAL FEATURES) SEPARABLE ELEMENT 99-662 401a NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 107,707,600
WV NAV LRH WV 1 WEST VIRGINIA PORT DEVELOPMENT, WV PROJECT 106-53 557(3) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 24,144,000
WV NAV LRP WV 1 WEIRTON PORT, WV PROJECT 106-53 557(2) NEVER FUNDED NO OBLIGATION FOR CONSTRUCTION 15,274,778
# PROJECTS 147 TOTAL 14,348,670,778
NOTES:
(1) PROJECT/ELEMENT TYPE: PROJECT = WATER RESOURCES DEVELOPMENT PROJECT AUTHORIZED FOR CONSTRUCTION, INCLUDING AUTHORIZED ENVIRONMENTAL INFRASTRUCTURE ASSISTANCE PROGRAM IN ACCORDANCE WITH WRRDA 2014, SECTION 6001(f)(1)(B).
(2) PROJECT/ELEMENT PHASE AND STATUS: NEVER FUNDED = NEVER FUNDED FOR CONSTRUCTION, INCLUDING PROJECTS IN PRECONSTRUCTION ENGINEERING AND DESIGN; CONSTRUCTION NOT INITIATED = CONSTRUCTION FUNDED BUT PHYSICAL CONSTRUCTION NOT INITIATED; CONSTRUCTION PAUSED = CONSTRUCTION FUNDED BUT PHYSICAL CONSTRUCTION PAUSED.
(3) PER PUBLIC LAW 106-541, SEC. 507, NO CRITICAL RESTORATION PROJECT MAY BE INITIATED UNDER THIS SUBSECTION AFTER SEPTEMBER 30, 2005.

Authority: This notice is required by § 6001(c) of the Water Resources Reform and Development Act of 2014, Public Law 113-121, 128 STAT 1346-1347.

Dated: September 30, 2015.

Jo-Ellen Darcy,

Assistant Secretary of the Army (Civil Works).

[FR Doc. 2015-25586 Filed 10-6-15; 8:45 am]

BILLING CODE 3720-58-P