Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests

Download PDF
Federal RegisterApr 6, 2004
69 Fed. Reg. 18071 (Apr. 6, 2004)
March 30, 2004.

Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.

a. Type of Application: New Minor License.

b. Project No.: 620-009.

c. Date filed: October 3, 2003.

d. Applicant: NorQuest Seafoods Inc.

e. Name of Project: Chignik Hydroelectric Project.

f. Location: The Chignik Project is located on Indian Creek in Lake and Peninsula Borough, Alaska. The project affects approximately 58 acres of federal lands managed by the U.S. Bureau of Land Management.

g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).

h. Applicant Contact: Mr. Ron Soule, NorQuest Seafoods Inc., 5245 Shilshole Ave NW., Seattle, WA 98107-4833 or via telephone at (206) 281-7022, or via e-mail at: rsoule@norquest.com.

i. FERC Contact: Kenneth Hogan at (202) 502-8434 or kenneth.hogan@ferc.gov.

j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice.

All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.

The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

Motions to intervene and protests may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site ( http://www.ferc.gov ) under the “e-Filing” link.

k. This application has been accepted for filing, but is not ready for environmental analysis at this time.

l. The existing Chignik Hydroelectric Project operates continuously at 2.7 cubic-feet-per-second (cfs), and serves as the domestic water supply for the City of Chignik. The project consists of the following features: (1) a timber crib dam, spill way and overflow channel; (2) a 20.4 surface acre reservoir; (3) a 7,700 foot-long wood stave and steel pipeline; (4) a turbine and 60 kW generator; and (5) other appurtenant facilities.

NorQuest estimates that the average annual generation is 219,000 kilowatt hours (kWh). NorQuest uses the Chignik Hydroelectric Project facilities to augment the consumption of diesel fuel in their diesel generators used to supply electricity to NorQuest's cannery operations.

m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is also available for inspection and reproduction at the address in item h above.

You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.

n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application.

When the application is ready for environmental analysis, the Commission will issue a public notice requesting comments, recommendations, terms and conditions, or prescriptions.

All filings must (1) bear in all capital letters the title “PROTEST” or “MOTION TO INTERVENE”; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application.

Magalie R. Salas,

Secretary.

[FR Doc. E4-748 Filed 4-5-04; 8:45 am]

BILLING CODE 6717-01-P