Northern States Power Company (Monticello Nuclear Generating Plant, Unit No. 1); Order Approving Transfer of License and Conforming Amendment

Download PDF
Federal RegisterMay 19, 2000
65 Fed. Reg. 31937 (May. 19, 2000)

I.

Northern States Power Company (NSP or the licensee) is the holder of Facility Operating License No. DPR-22, which authorizes operation of Monticello Nuclear Generating Plant, Unit No. 1 (Monticello or the facility). The facility is located in Wright County at the licensee's site in Wright and Sherburne Counties, Minnesota. The license authorizes NSP to possess, use, and operate Monticello.

II.

By application dated October 29, 1999, as supplemented March 14 and April 25, 2000, the Commission was informed that NSP entered into an agreement on March 24, 1999, to merge with New Century Energies, Inc. (NCE). The initial application and the supplements are hereinafter collectively referred to as “the application,” unless otherwise indicated. Under the proposed transaction, NCE will be merged with and into NSP, which will be renamed Xcel Energy, Inc. (Xcel). At the time of the merger, NSP will transfer all of its existing electric and natural gas utility facilities and operations currently conducted directly by NSP to a newly formed utility operating company subsidiary (referred to herein as “New NSP”) of Xcel. The licensee requested approval of the proposed transfer of the Monticello facility operating license to New NSP. The application also requested approval of a conforming amendment to reflect the transfer. The proposed amendment would add a footnote to the license to reflect the transfer from NSP to New NSP, which will be known as Northern States Power Company, the same name now used by NSP.

According to the application for approval filed by NSP, the facility would be transferred to New NSP after approval of the proposed license transfer and New NSP would become responsible for the operation, maintenance, and eventual decommissioning of Monticello. No physical changes to the Monticello facility or operational changes were proposed in the application.

Approval of the transfer of the facility operating license and conforming license amendment was requested by NSP pursuant to 10 CFR 50.80 and 50.90. Notice of the application for approval and an opportunity for a hearing was published in the Federal Register on February 10, 2000 (65 FR 6641). Pursuant to such notice, Carol Overland, an individual, and North American Water Office, an environmental organization, filed hearing requests. The Commission currently has the matter under consideration.

Pursuant to 10 CFR 50.80, no license, or any right thereunder, shall be transferred, directly or indirectly, through transfer of control of the license, unless the Commission shall give its consent in writing. Upon review of the information in the application by NSP and other information before the Commission, and relying upon the representations and agreements contained in the application, the NRC staff has determined that New NSP is qualified to hold the license and that the transfer of the license to New NSP is otherwise consistent with applicable provisions of law, regulations, and orders issued by the Commission, subject to the conditions set forth below. The NRC staff has further found that the application for the proposed license amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended, and the Commission's rules and regulations set forth in 10 CFR Chapter 1; the facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; there is reasonable assurance that the activities authorized by the proposed license amendment can be conducted without endangering the health and safety of the public and that such activities will be conducted in compliance with the Commission's regulations; the issuance of the proposed license amendment will not be inimical to the common defense and security or the health and safety of the public; the issuance of the proposed amendment will be in accordance with 10 CFR Part 51 of the Commission's regulations; and all applicable requirements have been satisfied. The foregoing findings are supported by a safety evaluation dated May 12, 2000.

III.

Accordingly, pursuant to Sections 161b, 161i, 161o, and 184 of the Atomic Energy Act of 1954, as amended, 42 U.S.C. 2201(b), 2201(i), 2201(o), and 2234, and 10 CFR 50.80, It Is Hereby Ordered that the transfer of the license, as described herein, to New NSP is approved, subject to the following conditions:

(1) New NSP shall, prior to completion of the subject transfer, provide the Director of the Office of Nuclear Reactor Regulation satisfactory documentary evidence that New NSP has obtained the appropriate amount of insurance required of licensees under 10 CFR Part 140 of the Commission's regulations.

(2) New NSP shall provide the Director of the Office of Nuclear Reactor Regulation a copy of any application, at the time it is filed, to transfer (excluding grants of security interests or liens) from New NSP to its parent, Xcel Energy, Inc., or to any other affiliated company, facilities for the production, transmission, or distribution of electric energy having a depreciated book value exceeding 10 percent (10%) of New NSP's consolidated net utility plant, as recorded on its books of account.

(3) After receipt of all required regulatory approvals of the transfer of Monticello to New NSP, NSP shall inform the Director of the Office of Nuclear Reactor Regulation in writing of such receipt within 5 business days, and of the date of the closing of the transfer of Monticello no later than 7 business days before the date of closing. If the transfer of the license is not completed by April 1, 2001, this Order shall become null and void, provided, however, upon written application and for good cause shown, such date may in writing be extended.

It is further ordered that, consistent with 10 CFR 2.1315(b), a license amendment that makes changes, as indicated in Enclosure 2 to the cover letter forwarding this Order, to conform the license to reflect the subject license transfer is approved. The amendment shall be issued and made effective at the time the proposed license transfer is completed.

This Order is effective upon issuance.

For further details with respect to this action, see the initial application dated October 29, 1999, supplements dated March 14 and April 25, 2000, and the safety evaluation dated May 12, 2000, which are available for public inspection at the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, and accessible electronically through the ADAMS Public Electronic Reading Room link at the NRC Web site (http://www.nrc.gov).

Dated at Rockville, Maryland, this 12th day of May 2000.

For the Nuclear Regulatory Commission.

Brian W. Sheron,

Acting Director, Office of Nuclear Reactor Regulation.

[FR Doc. 00-12618 Filed 5-18-00; 8:45 am]

BILLING CODE 7590-01-P