Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NSPS for Glass Manufacturing Plants (Renewal)

Download PDF
Federal RegisterJul 1, 2021
86 Fed. Reg. 35086 (Jul. 1, 2021)

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Notice.

SUMMARY:

The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NSPS for Glass Manufacturing Plants (EPA ICR Number 1131.13, OMB Control Number 2060-0054), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through August 31, 2021. Public comments were previously requested, via the Federal Register , on May 12, 2020 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

DATES:

Additional comments may be submitted on or before August 2, 2021.

ADDRESSES:

Submit your comments, referencing Docket ID Number EPA-HQ-OECA-2014-0041 online using www.regulations.gov (our preferred method), or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW, Washington, DC 20460. EPA's policy is that all comments received will be included in the public docket without change including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI), or other information whose disclosure is restricted by statute.

Submit written comments and recommendations to OMB for the proposed information collection within 30 days of publication of this notice to www.reginfo.gov/public/do/PRAMain. Find this particular information collection by selecting “Currently under 30-day Review—Open for Public Comments” or by using the search function.

FOR FURTHER INFORMATION CONTACT:

Patrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460; telephone number: (202) 564-2970; fax number: (202) 564-0050; email address: yellin.patrick@epa.gov.

SUPPLEMENTARY INFORMATION:

Supporting documents, which explain in detail the information that the EPA will be collecting, are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov,, or in person, at the EPA Docket Center, WJC West, Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone number for the Docket Center is 202-566-1744. For additional information about EPA's public docket, visit: http://www.epa.gov/dockets.

Abstract: The New Source Performance Standards (NSPS) for Glass Manufacturing Plants (40 CFR part 60, subpart CC) were proposed on June 15, 1979; promulgated on October 7, 1980; and amended on both October 19, 1984, and October 17, 2000. These regulations apply to both existing and new glass melting furnaces located at glass manufacturing plants. Owners and operators of affected facilities are required to comply with reporting and recordkeeping requirements for the General Provisions (40 CFR part 60, subpart A), as well as for the specific requirements at 40 CFR part 60, subpart CC. This includes submitting initial notifications, performance tests and periodic reports and results, and maintaining records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. This information is being collected to assure compliance with 40 CFR part 60, subpart CC.

Form Numbers: None.

Respondents/affected entities: Glass manufacturing facilities.

Respondent's obligation to respond: Mandatory (40 CFR part 60, subpart CC).

Estimated number of respondents: 41 (total).

Frequency of response: Semiannually.

Total estimated burden: 850 hours (per year). Burden is defined at 5 CFR 1320.3(b).

Total estimated cost: $338,000 (per year), which includes $238,000 in annualized capital/startup and/or operation & maintenance costs.

Changes in the Estimates: There is no change in burden from the most recently approved ICR as currently identified in the OMB Inventory of Approved Burdens. This is due to two considerations: (1) The regulations have not changed over the past three years and are not anticipated to change over the next three years; and (2) the growth rate for this industry is very low or non-existent, so there is no significant change in the overall burden. Since there are no changes in the regulatory requirements and there is no significant industry growth, there are also no changes in the capital/startup or operation and maintenance (O&M) costs.

Courtney Kerwin,

Director, Regulatory Support Division.

[FR Doc. 2021-14122 Filed 6-30-21; 8:45 am]

BILLING CODE 6560-50-P