Drawbridge Operation Regulation; Willamette River at Portland, OR

Download PDF
Federal RegisterJul 13, 2016
81 Fed. Reg. 45232 (Jul. 13, 2016)

AGENCY:

Coast Guard, DHS.

ACTION:

Notice of deviation from drawbridge regulation.

SUMMARY:

The Coast Guard has issued a temporary deviation from the operating schedule that governs four Multnomah County bridges: The Broadway Bridge, mile 11.7; Burnside Bridge, mile 12.4; Morrison Bridge, mile 12.8; and Hawthorne Bridge, mile 13.1; all crossing the Willamette River at Portland, OR. This deviation is necessary to accommodate the annual Portland Providence Bridge Pedal event. The deviation allows the bridges to remain in the closed-to-navigation position to allow safe roadway movement of event participants.

DATES:

This deviation is effective from 6 a.m. to 12:30 p.m. on August 14, 2016.

ADDRESSES:

The docket for this deviation, [USCG-2016-00643] is available at http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this deviation.

FOR FURTHER INFORMATION CONTACT:

If you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, email d13-pf-d13bridges@uscg.mil.

SUPPLEMENTARY INFORMATION:

Multnomah County has requested a temporary deviation from the operating schedule for the Broadway Bridge, mile 11.7; Burnside Bridge, mile 12.4; Morrison Bridge, mile 12.8; and Hawthorne Bridge, mile 13.1; all crossing the Willamette River at Portland, OR. The requested deviation is to accommodate the annual Portland Providence Bridge Pedal event. To facilitate this event, the draws of theses bridges will be maintained as follows: The Broadway Bridge provides a vertical clearance of 90 feet in the closed-to-navigation position; Burnside Bridge provides a vertical clearance of 64 feet in the closed-to-navigation position; Morrison Bridge provides a vertical clearance of 69 feet in the closed-to-navigation position; and Hawthorne Bridge provides a vertical clearance of 49 feet in the closed-to-navigation position; all clearances are referenced to the vertical clearance above Columbia River Datum 0.0. The normal operating schedule for all four bridges is in 33 CFR 117.897. This deviation allows the Broadway Bridge, Burnside Bridge, Morrison Bridge, and Hawthorne Bridge to remain in the closed-to-navigation position and need not open for maritime traffic from 6 a.m. to 12:30 p.m. on August 14, 2016. Waterway usage on this part of the Willamette River includes vessels ranging from commercial tug and barge to small pleasure craft.

Vessels able to pass through the bridge in the closed-to-navigation positions may do so at any time. The bridges will be able to open for emergencies, and there is no immediate alternate route for vessels to pass. The Coast Guard will inform the users of the waterway, through our Local and Broadcast Notices to Mariners, of the change in operating schedule for the bridges so that vessels can arrange their transits to minimize any impact caused by the temporary deviation.

In accordance with 33 CFR 117.35(e), the drawbridges must return to their regular operating schedules immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35.

Dated: July 6, 2016.

Steven M. Fischer,

Bridge Administrator, Thirteenth Coast Guard District.

[FR Doc. 2016-16471 Filed 7-12-16; 8:45 am]

BILLING CODE 9110-04-P