SUMMARY:

This document provides the public with notice that CSX Transportation, Inc. (CSX) submitted to FRA its Positive Train Control Safety Plan (PTCSP) Version 1.0, dated September 24, 2015. CSX asks FRA to approve its PTCSP and issue a PTC System Certification for CSX's Interoperable Electronic Train Management System (I-ETMS) under 49 CFR 236.1009 and 236.1015.

DATES:

FRA will consider communications received by August 23, 2016 before taking final action on the PTCSP. FRA may consider comments received after that date if practicable.

ADDRESSES:

All communications concerning this proceeding should identify the appropriate docket number and may be submitted by any of the following methods:

  • Web site: http://www.regulations.gov. Follow the online instructions for submitting comments.
  • Fax: 202-493-2251.
  • Mail: Docket Operations Facility, U.S. Department of Transportation, 1200 New Jersey Avenue SE., W12-140, Washington, DC 20590.
  • Hand Delivery: 1200 New Jersey Avenue SE., Room W12-140, Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal Holidays.

FOR FURTHER INFORMATION CONTACT:

Dr. Mark Hartong, PE, Senior Scientific Technical Advisor, at (202) 493-1332, Mark.Hartong@dot.gov; or Mr. David Blackmore, Railroad Safety Program Manager for Advanced Technology, at (312) 835-3903, David.Blackmore@dot.gov.

SUPPLEMENTARY INFORMATION:

In its PTCSP, CSX asserts its I-ETMS is designed as a vital overlay PTC system as defined in 49 CFR 236.1015(e)(2). The PTCSP describes CSX's I-ETMS implementation and the associated I-ETMS safety processes, safety analyses, and test, validation, and verification processes used during development of I-ETMS. The PTCSP also contains CSX's operational and support requirements and procedures.

CSX's PTCSP and the accompanying request for approval and system certification are available for review online at www.regulations.gov (Docket No. FRA-2010-0028) and in person at DOT's Docket Operations Facility, 1200 New Jersey Avenue SE., W12-140, Washington, DC 20590. The Docket Operations Facility is open from 9 a.m. to 5 p.m., Monday through Friday, except Federal Holidays.

Interested parties are invited to comment on the PTCSP by submitting written comments or data. During its review of the PTCSP, FRA will consider any comments or data submitted. However, FRA may elect not to respond to any particular comment and, under 49 CFR 236.1009(d)(3), FRA maintains the authority to approve or disapprove the PTCSP at its sole discretion. FRA does not anticipate scheduling a public hearing regarding CSX's PTCSP because the circumstances do not appear to warrant a hearing. If any interested party desires an opportunity for oral comment, the party should notify FRA in writing before the end of the comment period and specify the basis for his or her request.

Privacy Act Notice

Anyone can search the electronic form of any written communications and comments received into any of our dockets by the name of the individual submitting the comment (or signing the document, if submitted on behalf of an association, business, labor union, etc.). Under 49 CFR 211.3, FRA solicits comments from the public to better inform its processes. DOT posts these comments, without edit, including any personal information the commenter provides, to www.regulations.gov,, as described in the system of records notice (DOT/ALL-14 FDMS), which you can review at www.dot.gov/privacy. See http://www.regulations.gov/#!privacyNotice for the privacy notice of regulations.gov.

Robert C. Lauby,

Associate Administrator for Railroad Safety, Chief Safety Officer.

[FR Doc. 2016-12308 Filed 5-24-16; 8:45 am]

BILLING CODE 4910-06-P