AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
EFFECTIVE DATE:
May 22, 2008.
FOR FURTHER INFORMATION CONTACT:
Irina Itkin (Thailand) and Irene Gorelik (Vietnam), AD/CVD Operations, Offices 2 and 9, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, N.W., Washington, DC 20230; telephone (202) 482-0656 and (202) 482-6905, respectively.
SUPPLEMENTARY INFORMATION:
BACKGROUND
On March 6, 2008, the Department of Commerce (“the Department”) published notices for the preliminary results of the administrative reviews of the antidumping duty orders on certain frozen warmwater shrimp from Thailand and the Socialist Republic of Vietnam (“Vietnam”), covering the period February 1, 2006, through January 31, 2007. See Certain Frozen Warmwater Shrimp From Thailand: Preliminary Results and Preliminary Partial Rescission of Antidumping Duty Administrative Review, 73 FR 12088 (March 6, 2008); and Certain Frozen Warmwater Shrimp from the Socialist Republic of Vietnam: Preliminary Results, Preliminary Partial Rescission and Final Partial Rescission of the Second Administrative Review, 73 FR 12127 (March 6, 2008). The final results for these administrative reviews are currently due no later than July 7, 2008, the next business day after 120 days from the date of publication of the preliminary results of review.
EXTENSION OF TIME LIMIT FOR THE FINAL RESULTS
Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires theDepartment issue the final results of an administrative review within 120 days after the date on which the preliminary results are published. If it is not practicable to complete the review within that time period, section 751(a)(3)(A) of the Act allows the Department to extend the deadline for the final results to a maximum of 180 days after the date on which the preliminary results are published.
With respect to shrimp from Thailand, the Department requires additional time to properly consider the numerous and complex issues raised by interested parties in their case briefs. Similarly, with respect to shrimp from Vietnam, the Department requires additional time to consider the issues raised in case briefs from multiple interested parties, including the calculation of the dumping margins and the separate-rates status for numerous non-mandatory companies.
Thus, it is not practicable to complete these reviews within the original time limit. Therefore, the Department is extending the time limit for completion of the final results of these reviews by 60 days, in accordance with section 751(a)(3)(A) of the Act. The final results are now due no later than September 2, 2008.
We are issuing and publishing this notice in accordance with sections 751(a)(1) and 777(i)(1) of the Act.
Dated: May 15, 2008.
Stephen J. Claeys,
Deputy Assistant Secretary for Import Administration.
[FR Doc. E8-11511 Filed 5-21-08; 8:45 am]
BILLING CODE 3510-DS-S