Buy America Waiver Notification

Download PDF
Federal RegisterSep 16, 2016
81 Fed. Reg. 63853 (Sep. 16, 2016)

AGENCY:

Federal Highway Administration (FHWA), DOT.

ACTION:

Notice.

SUMMARY:

This notice provides information regarding FHWA's finding that a Buy America waiver is appropriate for the use of non-domestic iron and steel components of electric vehicle DC fast charging stations with maximum power (50 kw), voltage range (200-500 VDC), and current output (165 ADC) in the State of Massachusetts.

DATES:

The effective date of the waiver is September 19, 2016.

FOR FURTHER INFORMATION CONTACT:

For questions about this notice, please contact Mr. Gerald Yakowenko, FHWA Office of Program Administration, (202) 366-1562, or via email at gerald.yakowenko@dot.gov. For legal questions, please contact Mr. William Winne, FHWA Office of the Chief Counsel, 202-366-1397, or via email at William.Winne@dot.gov. Office hours for the FHWA are from 8:00 a.m. to 4:30 p.m., E.T., Monday through Friday, except Federal holidays.

SUPPLEMENTARY INFORMATION:

Electronic Access

An electronic copy of this document may be downloaded from the Federal Register's home page at: http://www.archives.gov and the Government Printing Office's database at: http://www.access.gpo.gov/nara.

Background

The FHWA's Buy America policy in 23 CFR 635.410 requires a domestic manufacturing process for any steel or iron products (including protective coatings) that are permanently incorporated in a Federal-aid construction project. The regulation also provides for a waiver of the Buy America requirements when the application would be inconsistent with the public interest or when satisfactory quality domestic steel and iron products are not sufficiently available. This notice provides information regarding FHWA's finding that a Buy America waiver is appropriate for use of non-domestic iron and steel components of electric vehicle DC fast charging stations with maximum power (50 kw), voltage range (200-500 VDC) and current output (165 ADC) in the State of Massachusetts.

In accordance with Division K, section 122 of the “Consolidated and Further Continuing Appropriations Act, 2015” (Pub. L. 113-235), FHWA published a notice of intent to issue a waiver on its Web site: http://www.fhwa.dot.gov/construction/contracts/waivers.cfm?id=129 on June 16th. The FHWA received no comments in response to the publication. Based on all the information available to the agency, FHWA concludes that there are no domestic manufacturers of iron and steel components compatible with electric vehicle DC fast charging stations with maximum power (50 kw), voltage range (200-500 VDC) and current output (165 ADC) that meets the grant requirements.

In accordance with the provisions of section 117 of the SAFETEA-LU Technical Corrections Act of 2008 (Pub. L. 110-244, 122 Stat. 1572), FHWA is providing this notice as its finding that a waiver of Buy America requirements is appropriate. The FHWA invites public comment on this finding for an additional 15 days following the effective date of the finding. Comments may be submitted to FHWA's Web site via the link provided to the waiver page noted above.

(Authority: 23 U.S.C. 313; Pub. L. 110-161, 23 CFR 635.410)

Issued on: August 29, 2016.

Gregory G. Nadeau,

Administrator, Federal Highway Administration.

[FR Doc. 2016-22305 Filed 9-15-16; 8:45 am]

BILLING CODE 4910-22-P