Approval and Promulgation of Air Quality Implementation Plans; Texas; Permits by Rule

Download PDF
Federal RegisterSep 28, 2005
70 Fed. Reg. 56612 (Sep. 28, 2005)

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Proposed rule.

SUMMARY:

EPA is proposing to approve a State Implementation Plan (SIP) revision for the State of Texas. This action removes a provision from the Texas SIP which provided public notice and opportunity for public comment for concrete batch plants which were constructed under a permit by rule (PBR). On September 1, 2000, Texas replaced the PBR for concrete batch plants with a standard permit for concrete batch plants. The standard permit for concrete batch plants also requires public notice for concrete batch plant subject to the standard permit. Texas maintained the public notice requirements of its PBR to assure that proper procedures were followed for concrete batch plants that were permitted under the PBR prior to the effective date of the standard permit. All authorization requests for concrete batch plants which constructed under the PBR have now been resolved and the public notice and comment provisions under the PBR are no longer needed.

DATES:

Written comments must be received on or before October 28, 2005.

ADDRESSES:

Comments may be mailed to Mr. David Neleigh, Chief, Air Permits Section (6PD-R), Environmental Protection Agency, 1445 Ross Avenue, Suite 1200, Dallas, Texas 75202-2733. Comments may also be submitted electronically or through hand delivery/courier by following the detailed instructions in the ADDRESSES section of the direct final rule located in the rules section of this Federal Register.

FOR FURTHER INFORMATION CONTACT:

Stanley M. Spruiell, Air Permits Section (6PD-R), Environmental Protection Agency, Region 6, 1445 Ross Avenue, Suite 700, Dallas, Texas 75202-2733, telephone (214) 665-7212; fax number (214) 665-7263; e-mail address spruiell.stanley@epa.gov.

SUPPLEMENTARY INFORMATION:

In the final rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule without prior proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments. A detailed rationale for the approval is set forth in the direct final rule. If no adverse comments are received in response to this action rule, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any parties interested in commenting on this action should do so at this time. Please note that if EPA receives adverse comment on an amendment, paragraph, or section of this rule and if that provision may be severed from the remainder of the rule, EPA may adopt as final those provisions of the rule that are not the subject of an adverse comment.

For additional information, see the direct final rule which is located in the rules section of this Federal Register.

Dated: September 19, 2005.

Lawrence E. Starfield,

Acting Regional Administrator, Region 6.

[FR Doc. 05-19357 Filed 9-27-05; 8:45 am]

BILLING CODE 6560-50-P