From Casetext: Smarter Legal Research

All. for Wild Rockies v. Probert

UNITED STATES DISTRICT COURT FOR THE DISTRICT OF MONTANA MISSOULA DIVISION
Oct 3, 2019
412 F. Supp. 3d 1188 (D. Mont. 2019)

Summary

finding that biological opinion was flawed because the Service failed to consider temporary increases in motor route density as a result of ineffective road closures

Summary of this case from WildEarth Guardians v. Steele

Opinion

CV 18-67-M-DWM

2019-10-03

ALLIANCE FOR the WILD ROCKIES, Plaintiff, v. Cheryl PROBERT, Kootenai National Forest Supervisor, et al., Defendants.

Rebecca Kay Smith, Public Interest Defense Center, Timothy M. Bechtold, Bechtold Law Firm, Missoula, MT, for Plaintiff. John P. Tustin, Sarah Jane Sheffield, U.S. Department of Justice, Washington, DC, for Defendants.


Rebecca Kay Smith, Public Interest Defense Center, Timothy M. Bechtold, Bechtold Law Firm, Missoula, MT, for Plaintiff.

John P. Tustin, Sarah Jane Sheffield, U.S. Department of Justice, Washington, DC, for Defendants.

OPINION and ORDER

Donald W. Molloy, District Judge

This case concerns previously adjudicated road closures in the Kootenai National Forest. In October 2013, Plaintiff Alliance for the Wild Rockies ("Alliance") brought an action under the National Environmental Policy Act ("NEPA"), National Forest Management Act ("NFMA"), and Endangered Species Act ("ESA"), arguing that the Pilgrim Creek Timber Sale Project ("Pilgrim Project") would create a net increase in linear miles of total roads in violation of Standard II(B) of the 2011 Access Amendments to the Kootenai National Forest Plan. Judge Christensen ultimately held that the Project complied with the Access Amendments, see All. for the Wild Rockies v. Bradford , 35 F. Supp. 3d 1246 (D. Mont. 2014), and the Ninth Circuit affirmed, All. for the Wild Rockies v. Bradford , 856 F.3d 1238 (9th Cir. 2017). The Ninth Circuit deferred to the Forest Service's interpretation of the Access Amendments, concluding it was reasonable for the agency to exclude roads closed to motorized access by berms or barriers from "linear miles of total roads." Id. at 1243. The court warned, however, that "any closure that fails to effectively prevent motorized access fails to comply with Standard II(B) of the Access Amendments." Id. (emphasis added). This case arises out of that cautionary language.

Based on allegations of illegal use precipitated by ineffective closures, Alliance brought claims under NEPA, NFMA, and the ESA. Alliance's NFMA claims and part of its NEPA claim have been dismissed. (See Order, Doc. 23.) The remaining issues are: (1) whether the agencies must reinitiate ESA Section 7 consultation regarding the Access Amendments and/or Pilgrim Project; (2) whether there is unpermitted ESA Section 9 take regarding the Access Amendments and/or the Pilgrim Project; and (3) whether the Forest Service must prepare a supplemental environmental impact statement ("EIS") for the Pilgrim Project.

There are three motions before the Court. Alliance first seeks to supplement the administrative record with, or have the Court take judicial notice of, two documents: (1) a 2016 journal article on the population status of the Cabinet-Yaak grizzly bear population (the "Kendall article") and (2) the documents listed in the "Literature Cited" section of the United States Fish and Wildlife Service's 2011 Biological Opinion on grizzly bears for the Access Amendments. (Doc. 32.) The parties have also filed cross-motions for summary judgment. (Docs. 36, 40.) Alliance's motion to supplement is denied but its motion for summary judgment is granted.

FACTUAL BACKGROUND

I. Access Amendments

In November 2011, the Forest Service amended the Forest Plans of the Kootenai, Idaho Panhandle, and Lolo National Forests to include wheeled motorized vehicle access and security guidelines. AR283:001790. The "Access Amendments" set standards for open and total roads, and security areas for Bear Management Units ("BMUs") within the Selkirk Recovery Zone on the Idaho Panhandle National Forest and the Cabinet-Yaak Recovery Zone on the Kootenai, Idaho Panhandle, and Lolo National Forests. AR283:001790–91. Individual open and total motorized access density and core area standards were set for each of the thirty BMUs. AR284:001564–66. More specific to the present case, the Access Amendments also set limits on linear miles of open and total roads, known as the "2010 baseline," for each of the seven "Bear Outside Recovery Zone" polygons ("BORZ areas"). AR283:001790. These areas are outside the Recovery Zones but experience recurring use by grizzly bears. AR283:001790. The Priest Lake, Pack River, and Mission-Moyie BORZ areas fall within the Idaho Panhandle National Forest, while the Cabinet Face, Clark Fork, West Kootenai, and Tobacco BORZ areas fall within the Kootenai National Forest. See AR283:001792–93. II. Pilgrim Project

"Open roads are roads that are open for all or part of the active bear year. The measurement of ‘total roads’ includes roads that do not have restrictions on motorized use and roads that are closed to public motorized use." (Doc. 12-1 at 5.)

In 2013, the Forest Service approved the Pilgrim Project, AR14:000969, which authorizes timber harvest on the Kootenai National Forest in order to "maintain[ ] and increas[e] forest resilience to insects, disease and disturbance ... and improv[e] big game forage production while providing support to the local economy through commercial timber harvest," AR14:000985. The Project is located entirely within the Clark Fork BORZ area. AR14:001001. The Forest Service's 2013 Record of Decision authorized the construction of approximately 4.7 miles of new permanent roads during Project implementation. AR14:001010. As mentioned above, Alliance previously challenged the Project on the grounds that barriered roads should have counted toward linear miles of total roads. The Ninth Circuit concluded, however, that the mileage was properly omitted, assuming the closures were effective. All. for the Wild Rockies , 856 F.3d at 1243.

SUMMARY CONCLUSION

Defendants concede that in developing the Access Amendments and approving the Pilgrim Project, the agencies assumed road closures were effective and they did not specifically consider the environmental impacts of illegal use caused by ineffective closures. Defendants insist, however, that temporary increases in mileage above baseline levels was explicitly contemplated in and allowed by the Access Amendments. Alliance persuasively shows that while the agencies' assumptions regarding closure effectiveness may have been reasonable in 2011, data over the last eight years demonstrates that ineffective closures have contributed to increases in linear road miles and potentially impacted grizzly bears in ways not previously considered. Accordingly, reinitiation of consultation for both the Access Amendments and the Pilgrim Project is required. It is less clear whether a supplemental EIS for the Pilgrim Project is required. Ultimately though, because the original NEPA documents for the Project incorrectly assumed all closures were effective, a supplemental EIS is necessary.

LEGAL STANDARD

NEPA and ESA claims are reviewed under the Administrative Procedure Act ("APA"), which authorizes a court to "compel agency action unlawfully withheld or unreasonably delayed," 5 U.S.C. § 706(1), and to "hold unlawful and set aside agency action, findings and conclusions found to be ... arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law," 5 U.S.C. § 706(2)(A). San Luis & Delta-Mendota Water Auth. v. Jewell , 747 F.3d 581, 601 (9th Cir. 2014). An agency action is unlawfully withheld if the agency fails to take a "discrete agency action that it is required to take," i.e., an action that is "demanded by law," including "agency regulations that have the force of law." Norton v. S. Utah Wilderness All. , 542 U.S. 55, 64–65, 124 S.Ct. 2373, 159 L.Ed.2d 137 (2004) (emphasis omitted). Agency action is arbitrary and capricious if the administrative record demonstrates that the "agency has relied on factors which Congress has not intended it to consider, entirely failed to consider an important aspect of the problem, [or] offered an explanation for its decision that runs counter to the evidence before the agency." Motor Vehicle Mfrs. Ass'n of U.S., Inc. v. State Farm Mut. Auto. Ins. Co. , 463 U.S. 29, 43, 103 S.Ct. 2856, 77 L.Ed.2d 443 (1983).

Where an agency's administrative record is complete and constitutes the whole and undisputed facts underlying agency decisionmaking, summary judgment is the appropriate vehicle to address claims under both § 706(1) and (2). City & Cty. of S.F. v. United States , 130 F.3d 873, 877 (9th Cir. 1997) ("[T]he function of the district court is to determine whether or not as a matter of law the evidence in the administrative record permitted the agency to make the decision it did.").

ANALYSIS

I. Supplementation

Review under the APA is generally limited to the administrative record that existed at the time the agency made its decision. See Citizens to Preserve Overton Park, Inc. v. Volpe , 401 U.S. 402, 420, 91 S.Ct. 814, 28 L.Ed.2d 136 (1971) ; 5 U.S.C. § 706. Here, Alliance proffers additional documents for consideration: (1) the Kendall article, (Doc. 33-1), and (2) the documents listed in the "Literature Cited" section of the United States Fish and Wildlife Service's 2011 Biological Opinion on grizzly bears for the Access Amendments, (Doc. 33-2). Alliance make three unpersuasive arguments for their consideration: (1) the record for ESA and supplemental EIS claims is not limited by the APA, (2) the proffered documents qualify under certain extra-record exceptions, and (3) the documents can be judicially noticed.

A. APA Record Limitations

Alliance first seeks to circumvent the standard extra-records analysis by arguing that both its ESA claim and its claim for a supplemental EIS are not subject to the APA's record limitations. Neither argument is compelling.

1. ESA

ESA claims are analyzed under the APA because the ESA contains no internal standard of review. Village of False Pass v. Clark , 733 F.2d 605, 609 (9th Cir. 1984). However, Alliance insists that because ESA claims are actually brought pursuant to the ESA citizen suit provision, they are not subject to the administrative record limitation of the APA. See 5 U.S.C. § 704 (action reviewable under the APA when "there is no other adequate remedy in a court"). In so arguing, Alliance relies on Western Watersheds Project v. Kraayenbrink , 632 F.3d 472, 497 (9th Cir. 2011). In Kraayenbrink , the court determined that because claims under the ESA citizen suit provision are distinct from claims under the APA, courts "may consider evidence outside the administrative record for the limited purposes of reviewing ... ESA claim[s]." Id. (citing Wash. Toxics Coal. v. Envtl. Prot. Agency , 413 F.3d 1024, 1034 (9th Cir. 2005) ). But it is not that simple.

District courts have interpreted Kraayenbrink differently. Many view it as binding precedent that mandates an open record in ESA cases. See Natural Res. Def. Council v. Zinke , 347 F. Supp. 3d 465, 500–01 (E.D. Cal. 2018) ("The Court does not make law and cannot ignore an express holding of the Ninth Circuit that is directly on point.") (collecting cases); see also Indigenous Envtl. Network v. U.S. Dep't of State , CV 17–29/31–GF–BMM, 2017 WL 9280323, at *1 (D. Mont. Dec. 12, 2017). However, this Court has consistently taken a more restrictive view:

Kraayenbrink leaves us uncertain whether the panel discarded the APA record review rule entirely or simply found that the extra-record documents presented to the district court in that case fit within one of the four standard exceptions outlined above. The better view, in the opinion of this Court, is that the traditional four exceptions still apply to plaintiffs' requests for supplementation of the administrative record for ESA claims, but the narrowness of the construction and application of these exceptions, see Lands Council v. Powell, 395 F.3d 1019, 1030 (9th Cir. 2005) ("these exceptions are narrowly construed

and applied"), should be relaxed for such claims.

All. for Wild Rockies v. Kruger , 950 F. Supp. 2d 1172, 1177 (D. Mont. 2013) (internal quotation marks omitted); see Native Ecosystems Council v. Marten , 334 F. Supp. 3d 1124, 1129 (D. Mont. 2018) ; Wildwest Inst. v. Ashe , No. CV 13-6-M-DLC, 2013 WL 12134034, at *2 (D. Mont. Oct. 18, 2013).

The concern, as stated in Lands Council , is that "[w]ere the federal courts routinely or liberally to admit new evidence when reviewing agency decisions, it would be obvious that the federal courts would be proceeding, in effect, de novo, rather than with the proper deference to agency processes, expertise, and decision-making." 395 F.3d at 1030 ; see also Karuk Tribe of Cal. v. U.S. Forest Serv. , 681 F.3d 1006, 1017 (9th Cir. 2012) (en banc) (describing ESA case as "a record review case"). Alliance's argument is therefore rejected, and its ESA claims are subject to the same records limitations as other APA cases.

2. NEPA—Supplemental EIS

Alliance similarly argues that the extra-record documents may be considered in conjunction with its supplemental EIS claim because it seeks to "compel agency action unlawfully withheld or unreasonably delayed." 5 U.S.C. § 706(1). Alliance is correct that "[i]n such cases, review is not limited to the record as it existed at any single point in time, because there is no final agency action to demarcate the limits of the record." Friends of the Clearwater v. Dombeck , 222 F.3d 552, 560 (9th Cir. 2000). However, the record is not boundless. While a challenge under § 706(1) "allow[s] courts to go beyond the point at which the agency considered the record closed," the APA "limits courts to considering the documents the agency considered directly or indirectly that fall under a record review exception." All. for the Wild Rockies v. Marten , CV 16–35–M–DWM, 2016 WL 7174671, at *1 (D. Mont. Oct. 3, 2016). As was the case with Alliance's ESA claims, supplementation is limited to documents that meet one of the accepted extra-record exceptions discussed below. See Lands Council , 395 F.3d at 1030.

B. Extra-Record Exceptions

Alliance argues in the alternative that the proffered documents fit within the recognized extra-record exceptions:

In limited circumstances, district courts are permitted to admit extra-record evidence: (1) if admission is necessary to determine whether the agency has considered all relevant factors and has explained its decision, (2) if the agency has relied on documents not in the record, (3) when supplementing the record is necessary to explain technical terms or complex subject matter, or (4) when plaintiffs make a showing of agency bad faith.

Id. (internal quotation marks omitted). Alliance relies on (1) and (3).

Despite Alliance's characterization, the third exception is not at issue because Alliance has not shown the proffered documents are required to "explain technical terms or complex subject matter." Id. Rather, Alliance emphasizes that consideration of the information is necessary "to determine whether the agency has considered all relevant factors," id. , and provide necessary background information, see Love v. Thomas , 858 F.2d 1347, 1356 (9th Cir. 1988).

The merits question is whether ineffective road closures were accounted for in the agencies' consideration of the Access Amendments and Pilgrim Project. Neither the Kendall article nor the general list of "Literature Cited" speaks to this narrow issue. This case is not an opportunity to relitigate the Access Amendments' approach to grizzly bear recovery. Because Alliance has not shown that the documents are necessary to determine whether the agencies considered all relevant factors related to the limited closures issue, supplementation is not appropriate.

C. Judicial Notice

Alternatively, Alliance asks the Court to take judicial notice of the proffered documents on the grounds that the documents are "the agency's own records." Dent v. Holder , 627 F.3d 365, 371 (9th Cir. 2010). Courts may take judicial notice of a fact if it "is not subject to reasonable dispute because it ... can be accurately and readily determined from sources whose accuracy cannot reasonably be questioned." Fed. R. Evid. 201(b)(2). While published government documents are generally subject to notice, Daniels-Hall v. Nat'l Educ. Ass'n , 629 F.3d 992, 998–99 (9th Cir. 2010), the contents of those documents cannot be used to second guess an agency decision, see All. for the Wild Rockies v. Zinke , 265 F. Supp. 3d 1161, 1175 (D. Mont. 2017). Fundamentally, "a party cannot circumvent the rules governing record supplementation by asking for judicial notice rather than supplementation." All. for the Wild Rockies , CV 16–35–DWM, 2016 WL 7174671 at *3 (internal quotation marks omitted). Thus, judicial notice is not appropriate.

Based on the foregoing, Alliance's motion to supplement is denied.

II. Summary Judgment

As mentioned above, the crux of this dispute is whether the agencies adequately considered the impact of ineffective road closures on grizzly bears when they adopted the Access Amendments and approved the Pilgrim Project. While Defendants concede that the decision documents do not explicitly address ineffective road closures or illegal road use, they maintain that the agencies' consideration of "temporary" road impacts was, and continues to be, sufficient. Alliance, on the other hand, insists that the omission has resulted in unpermitted take in violation of Section 9 and requires reinitiation of consultation under Section 7 of the ESA. Alliance also argues a supplemental EIS is required under NEPA. While its NEPA claims presents a closer question, Alliance prevails on both its ESA and NEPA claims.

A. ESA

Certain sections with Title 50 of the Code of Federal Regulations were updated as of September 26, 2019. This order uses the regulatory citations in place at the time of the agency action and referred to by the parties in their briefing.

"The ESA obligates federal agencies ‘to afford first priority to the declared national policy of saving endangered species.’ " Pac. Coast Fed'n of Fishermen's Ass'n v. U.S. Bureau of Reclamation , 426 F.3d 1082, 1084–85 (9th Cir. 2005) (quoting Tenn. Valley Auth. v. Hill , 437 U.S. 153, 185, 98 S.Ct. 2279, 57 L.Ed.2d 117 (1978) ). Section 7 of the ESA directs each action agency to ensure, in consultation with the Fish and Wildlife Service, that "any action authorized, funded, or carried out by such agency ... is not likely to jeopardize the continued existence of any endangered species or threatened species" or cause the "destruction or adverse modification" of habitat designated as "critical" for such species. 16 U.S.C. § 1536(a)(2) ; 50 C.F.R. § 402.01(b). If, as is the case here, either the action agency or the consulting agency determines that the action "may affect" listed species or designated critical habitat, the agencies engage in formal consultation. 50 C.F.R. § 402.14(a). As a result of that consultation, the Fish and Wildlife Service issues a biological opinion, which assesses whether an action is likely to jeopardize a listed species or its critical habitat. 50 C.F.R. § 402.14(g) – (h). Where an action does not jeopardize a species but may result in incidental take, the Fish and Wildlife Service issues an "incidental take statement." Any taking in compliance with the statement's terms and conditions is then exempt from the general take prohibition of ESA Section 9. 16 U.S.C. § 1536(b)(4)(iv), (o)(2).

Here, the Forest Service formally consulted with the Fish and Wildlife Service in developing the Access Amendments, and the Fish and Wildlife Service issued a Biological Opinion. See AR284:001553–1779. The ESA analysis for the Pilgrim Project was then tiered to that biological opinion, AR12:000930, which also contains an incidental take statement for grizzly bears, providing that:

permanent increases in linear miles of open road and/or permanent increases in linear miles of total road beyond the standards in Table 4 of this biological opinion will result in levels of take that exceed the amount of incidental take we anticipate here.

AR284:001662. Table 4 provides the following baselines for each BORZ area:

BORZ Grizzly Total NFS Total Linear Total Linear Name Bear Size Lands Miles of Roads Miles of Open Ecosystem (Acres) (Acres) on NFS Lands Roads on NFS Lands Priest Lake Selkirk 80,733 75,793 316.4 314.4 Pack River Selkirk 33,869 28,097 41.9 37.9 Mission-Moyie Cabinet-Yaak 71,545 58,472 200.3 167.3 Moyie Clark Fork Cabinet-Yaak 101,701 100,223 256.1 176.9 Cabinet Cabinet-Yaak 27,140 26,177 164.1 128.0 Face West Cabinet-Yaak 173,122 169,705 615.3 315.9 Kootenai Tobacco Cabinet-Yaak 287,240 266,947 1,123.9 867.0

AR284:001571. The take statement requires that the Forest Service submit annual monitoring summary reports to the Fish and Wildlife Service, which detail the Forest Service's progress toward achieving the Recovery Zone standards. AR284:001664. While not required, included in these reports is information about open and total road mileage for each BORZ area. See, e.g. , AR43:000081 (2017 Annual Monitoring Summary Report).

Alliance argues that because the Forest Service and Fish and Wildlife Service failed to take into account ineffective road closures in their ESA analysis for both the Access Amendments and the Pilgrim Project, reinitiation of consultation is necessary. Under the ESA implementing regulations, an agency must reinitiate consultation on an action:

(a) If the amount or extent of taking specified in the incidental take statement is exceeded;

(b) If new information reveals effects of the action that may affect listed species or critical habitat in a manner or to an extent not previously considered;

(c) If the identified action is subsequently modified in a manner that causes an effect to the listed species or

critical habitat that was not considered in the biological opinion; or

(d) If a new species is listed or critical habitat designated that may be affected by the identified action.

50 C.F.R. § 402.16. Alliance persuasively argues that reinitiation is required under subsections (a), (b), and (c).

1. Preliminary Matters

a. Scope of Challenge

Defendants first argue that Alliance has improperly expanded the scope of its ESA challenge on summary judgment to include BORZ areas and a Recovery Zone not mentioned in its Notice of Intent to Sue or Amended Complaint. Defendants insist that the current case should be limited to the closures identified in the Clark Fork and Tobacco BORZ areas. Alliance, on the other hand, argues that the Forest Service was on notice that its reinitiation challenge requires consideration of all of the BORZ areas and Recovery Zones. Neither side is entirely correct.

In its December 20, 2018 Order, the Court focused on the specific closures Alliance identified in the Tobacco and Clark Fork BORZ areas. (See Doc. 23 at 19 ("Here, Alliance provided the Forest Service with sufficient notice of the issue of concern (road closures) within a discrete area (the Tobacco and Clark Fork BORZs.").) However, Alliance's Notice of Intent to Sue includes language more broadly applicable to Alliance's reinitiation challenge: "[T]he agencies must reinitiate ESA consultation on the Access Amendments and Pilgrim Project because the original analyses presumed no motorized access would occur behind berms and that assumption has proven false." (Doc. 12-1 at 4.) Similarly, Alliance's Amended Complaint specifically alleges:

Because (1) numerous earthen berms fail to effectively prevent motorized access, (2) numerous roads are open for motorized use although they are designated as closed, and (3) there are a number of illegal user-created open roads on the landscape, [the Forest Service] has allowed an increase in open and/or total roads above the Access Amendments baseline, which exceeds the amount of take authorized by the incidental take statement, thereby triggering the need for reinitiation of consultation.

(Doc. 4 at ¶ 113.) The Forest Service was therefore on notice of Alliance's broader reinitiation challenge, which is based on the same underlying facts as its allegations regarding the Clark Fork and Tobacco BORZ areas: illegal road use based on ineffective closures that were not considered during the original ESA process. On the other hand, insufficient notice was provided regarding Alliance's present allegations of increased mileage and illegal road use within Recovery Zones, which are subject to different mileage standards. The present case is thus limited to the BORZ areas.

b. Relative Importance of BORZ Areas

The parties also dispute the relative importance BORZ areas play in grizzly bear recovery. Fundamentally, Alliance argues that BORZ areas are important to grizzly bear habitat and recovery and the Access Amendments do not provide enough protection. But Alliance cannot use this case to relitigate the Access Amendments' approach to grizzly bear recovery. Any argument that the Access Amendment standards for BORZ areas provide inadequate protection to grizzly bears is beyond the scope of this case. See All. for the Wild Rockies , 856 F.3d at 1240 ("The Recovery Plan prescribes less protective management measures in BORZ polygons than in recovery zones."); see also AR284:001649 (noting that many current forest plans "do not specifically require management for grizzly bears or their habitat outside of the recovery zones").

c. Reinitiation by the Fish and Wildlife Service

Finally, Defendants argue that Alliance cannot maintain a reinitiation claim against the Fish and Wildlife Service because the Fish and Wildlife Service lacks the authority to require an action agency to reinitiate consultation. (Doc. 41 at 41–42.) This argument is inconsistent with the Ninth Circuit's view of consultation duties. See Salmon Spawning & Recovery All. v. Gutierrez , 545 F.3d 1220, 1229 (9th Cir. 2008) ("The duty to reinitiate consultation lies with both the action agency and the consulting agency."); Hoopa Valley Tribe v. Nat'l Marine Fisheries Serv. , 230 F. Supp. 3d 1106, 1116 (N.D. Cal. 2017) ("While the federal agencies' arguments might be compelling if this was an issue of first impression, the Ninth Circuit has already addressed this precise issue multiple times and confirmed that both the action agency and the consulting agency have a duty to reinitiate consultation."); Wild Fish Conserv. v. U.S. Envt'l Prot. Agency , 331 F. Supp. 3d 1210, 1226–27 (W.D. Wash. 2018) (collecting cases). Moreover, the regulatory language differs between initial consultation, see 50 C.F.R. § 402.14(a), and reinitiation of consultation, 50 C.F.R. § 402.16. Section 402.14 merely allows the Fish and Wildlife Service to request consultation. Reinitiation under § 402.16, on the other hand, obligates either the action agency or the Fish and Wildlife Service to act. Defendants' reliance on Defenders of Wildlife v. Flowers , 414 F.3d 1066, 1069–70 (9th Cir. 2005), which addresses § 402.14, is therefore misplaced. See Pacificans for a Scenic Coast v. Cal. Dep't of Trans. , 204 F. Supp. 3d 1075, 1093 (N.D. Cal. 2016). Alliance's reinitiation claims against the Fish and Wildlife Service stand.

2. Access Amendments

Alliance argues that reinitiation is appropriate under 50 C.F.R. § 402.16, as pervasive illegal road use has permitted incidental take to exceed baseline levels under subsection (a); eight years of evidence of such breaches and ineffective closures constitutes new information and reveals new effects on grizzly bears under subsection (b); and, ineffective closures constitute a broken conservation promise amounting to a modification under subsection (c). The record supports all three arguments.

a. Reinitiation under subsection (a)

"Reinitiation of formal consultation is required ... [i]f the amount or extent of taking specified in the incidental take statement is exceeded ...." 50 C.F.R. § 402.16(a). Here, the 2010 baseline road conditions for open and total roads serves as a surrogate for incidental take within the BORZ areas: "In the BORZ, permanent increases in linear miles of open road and/or ... total road beyond the standards in Table 4 of this biological opinion will result in levels of take that exceed the amount of incidental take we anticipate here, and reinitiation of consultation would be required." AR284:AR001662. Alliance argues that these baseline levels have been exceeded. Defendants disagree. The parties' dispute focuses on two aspects of the take statement: (1) what serves as the 2010 baseline and (2) what qualifies as a "permanent increase."

i. Applicable Baseline

The parties first dispute the applicable baseline. Alliance insists that the static baseline numbers provided in Table 4 of the Biological Opinion and Table 16 of the Record of Decision apply. Defendants, on the other hand, argue that "the Access Amendments allow for BORZ area baselines to be updated to reflect on the ground conditions or corrected in order to provide more accurate information." (Doc. 47 at 10); see, e.g. , AR43:000081 (updating mileage for 2017 bear year). Defendants insist that such updates can occur in two circumstances: (1) where the Forest Service lacks discretion to prevent road building and (2) to reflect the existing linear miles of road in 2010. Contrary to Defendants' position, the surrogate take level identified in the Access Amendments is static and pegged to the specified mileage in Table 4.

These tables are the same. Compare AR284:001571 with AR283:001848.

As explained by Defendants, the Forest Service has been "updating" the 2010 baseline amounts when it discovers mileage that was inadvertently omitted from the amounts included in Table 4. But the Forest Service's repeated modification of the 2010 baseline mileage is not consistent with the incidental take statement. While the take statement provides that the surrogate measure of take for grizzly bears is "the existing (2010) linear miles of road in each BORZ polygon," it includes a specific reference to the "standards in Table 4." AR284:001662; see also AR284:001571. The Forest Service may be able to persuasively argue that there were errors in the 2010 mileages. See AR30:000037 (Table 8 n.1) (annual monitoring report for bear year 2013 indicating that the baseline condition for open roads in the West Kootenai BORZ area was increased from 315.9 to 343.0 "due to the use of two roads to access private lands ... [that] were not identified as open in the Access Amendments baseline calculations"). But the specific mileages identified in that table were what the agencies considered in concluding that "this level of anticipated take in not likely to result in jeopardy to the grizzly bear." AR284:001663. Naturally then, any mileage not included in Table 4 was not considered in the take analysis. While Defendants are correct that these baselines are "flexible" in that they allow the Forest Service to add and subtract mileages below the baseline mileage amounts, the Forest Service cannot simply "update" that baseline as it goes along. See Gifford Pinchot Task Force v. U.S. Fish & Wildlife Serv. , 378 F.3d 1059, 1076–77 (9th Cir. 2004) (rejecting the Fish and Wildlife Service's attempt to "update" a biological opinion without reinitiating consultation), superseded on other grounds by 81 Fed. Reg. 7214 (Feb. 11, 2016).

Additionally, the record citations the Forest Service relies on in performing its updates is misleading. First, Defendants argue that "geographic information systems data can vary" and that the Forest Service "reserve[d] the ... right to correct and update systems as needed." (Doc. 47 at 12–13.) The citation for that reservation of rights, however, is to the disclaimer on the cover page of all agency decision documents that merely states data accuracy can vary. See, e.g. , AR282:001059. That boilerplate language does not trump the agency's obligations under the ESA and its implementing regulations. Second, as cited by Defendants, the Final Supplemental EIS for the Access Amendments provides that "[t]he biologists involved in the 2002-2003 BORZ analysis recognized that the mapping may need to be revisited and updated periodically." AR282:001155; (see Doc. 41 at 26 n.10). However, there is a difference between altering the BORZ area boundaries (what is contemplated in the Final Supplemental EIS) and adjusting baseline road mileage amounts within those boundaries (what the Forest Service is doing).

The 2010 baseline is static, and the mileage provided in Table 4 of the 2011 Biological Opinion, see AR284:001571, sets the threshold for permissible take.

ii. "Permanent Increases"

While Defendants concede that ineffective closures have caused baseline mileage levels to be exceeded in some instances, they insist those temporary increases fall within the existing take statement because it only prohibits permanent increases of mileage above baseline conditions. See AR284:001662. In response, Alliance argues that "chronically exceeding the baseline" mileage is a permanent increase. (Doc. 44 at 13.) Although Defendants are correct that certain roads are temporary, they fail to account for overall increases that are permanent.

The two tables below compare the annual mileage for each BORZ area from 2011 to 2018 to the Table 4 baselines:

Total Linear Miles of Roads BORZ Priest Pack Mission-Moyie Clark Cabinet West Tobacco Area Lake River Fork Face Kootenai Baseline 316.4 41.9 200.3 256.1 164.1 615.3 1,123.9 2011 316.4 37.7 200.3 236.3 164.1 607.9 1,109.3 20125 319.0 37.7 200.3 238.2 164.6 654.4 1,110.2 2013 319.0 37.7 200.3 238.2 164.6 641.9 1,108.3 2014 319.0 37.7 200.3 236.5 164.6 641.2 1,108.1 2015 NA NA NA 256.1 165.0 654.4 1,123.9 2016 325.7 37.7 272.0 240.9 165.0 638.1 1,104.1 2017 325.7 37.7 268.7 250.3 166.5 671.9 1,110.86 2018 319.2 37.7 271.1 250.4 169.8 639.7 1,107.0 Total Linear Miles of Open Roads BORZ Priest Pack Mission-Moyie Clark Cabinet West Tobacco Area Lake River Fork Face Kootenai Baseline 314.4 37.9 167.3 176.9 128.0 315.9 867.0 2011 314.4 33.7 167.3 172.4 130.0 323.7 867.0 2012 317.0 33.7 167.3 172.8 129.5 341.6 867.0 2013 317.0 33.7 167.3 172.8 129.5 342.3 864.2 2014 317.0 33.7 167.3 171.2 129.5 342.3 864.1 2015 NA NA NA 176.9 129.5 342.3 867.0 2016 317.2 33.7 240.0 183.8 130.5 340.4 860.0 2017 317.2 33.7 236.7 173.3 138.0 353.53 868.0 2018 317.2 33.7 239.7 173.6 140.8 360.6 864.9

[Editor's Note: The preceding image contains the reference for footnote ]

The baseline and annual values for the Clark Fork and Tobacco BORZ areas appear to have been transposed in the 2012 Report. This chart reflects what is believed to be the actual mileage for 2012.

See AR281:000011 (bear year 2011); AR07:000024 (bear year 2012); AR30:000036–37 (bear year 2013); AR31:000049 (bear year 2014); AR32:000055 (bear year 2015 – limited to Kootenai National Forest); AR42:000068 (bear year 2016); AR43:000081 (bear year 2017); (Ex. 6, Doc. 44-1 at 12) (bear year 2018 – not in administrative record). These tables reveal that both parties are correct in their assessment of the data. First, as Alliance argues, there was chronic noncompliance with baseline mileages in at least four of the BORZ areas over the last eight years. Second, as Defendants argue, there was variation in the mileage (i.e., temporary roads) in each BORZ area almost every year. See, e.g. , AR43:000082 (Table 9 n.6) (annual report noting a temporary increase in linear miles of open roads in the Cabinet Face BORZ "result[ing] from a gate being destroyed and portions of the 808 and 808E receiving use, use on barriered road 5095 and illegal use on two undetermined roads"). Nevertheless, it is the permanency of the overall increase in mileage that matters under the take statement, not the permanency of specific roads. Alliance persuasively argues that mileage increases in at least three of the BORZ areas are permanent in nature.

But even if Defendants could show that mileage from temporary illegal road use will eventually decrease, they cannot make the same "temporary" argument for their annual modifications of the baseline mileages for existing permanent roads. See, e.g. , AR43:000082 (Bear Year 2017 Table 9 n.5 (increasing the open road baseline in Cabinet Face BORZ area by 4.1 permanent miles)). As discussed above, "updates" to the 2010 mileage amount are permanent increases that push most of the BORZ areas above baseline levels. See AR43:000081 (indicating that baselines have increased in all BORZ areas except for Pack River).

In light of these permanent increases beyond baseline levels, permitted take has been exceeded in violation of Section 9, compelling reinitiation under § 402.16(a).

b. Reinitiation under subsection (b)

"Reinitiation of formal consultation is required ... [i]f new information reveals effects of the action that may affect listed species ... in a manner or to an extent not previously considered ...." 50 C.F.R. § 402.16(b). However, the mere existence of new information does not necessarily trigger reinitiation of consultation. Conservation Cong. v. Finley , 774 F.3d 611, 619 (9th Cir. 2014). The crux of the matter is whether the new information reveals effects that "w[ere] not previously considered." 50 C.F.R. § 402.16(b).

Defendants concede that the Access Amendments do not directly reference temporary mileage increases caused by ineffective closures and that they receive new information every year regarding road closures. See AR279:000211. However, Defendants insist that such effects were considered in the Access Amendments because the Access Amendments contemplated temporary increases in road miles for other reasons, such as "temporary roads ... constructed in order to access harvest units." See AR279:000211–12 (citing the 2013 Biological Opinion for the 2015 Revised Forest Plan, AR35:001928); AR280:000213; AR284:001570. According to Defendants, because other temporary road uses were considered, "there has been no unanticipated event." (Doc. 41 at 36.) Defendants also emphasize the ephemeral nature of ineffective closures, asserting that once discovered, "breaches are typically repaired by the next bear year." AR279:000212.

But Alliance persuasively argues that the nature and impact of the temporary use considered in the Access Amendments is different from illegal use precipitated by ineffective closures. For example, temporary road use associated with timber harvest activities must "be scheduled such that disturbance of grizzly bears resulting from road use is minimized." AR284:001570. Or, certain public motorized use is only allowed "during the bear summer season." AR284:001570. But, as argued by Alliance, illegal use caused by ineffective closures is not subject to any schedule or season. Thus, there is discord between what the Amendments anticipated (regulated temporary use) and what is actually happening (illegal temporary use).

Contrary to the parties' characterization, (see Doc. 44 at 22–23; Doc. 47 at 14–16), the above analysis does not implicate agency deference. Defendants can argue that the existing analysis is sufficient to cover illegal use. That proposition is either correct or incorrect based on the factual record. Defendants cannot, on the other hand, simply redefine "temporary" to include illegal road use after the fact and expect the Court to defer to that dubious etymology. See Motor Vehicle Mfrs. Ass'n of U.S. , 463 U.S. at 50, 103 S.Ct. 2856 (rejecting counsel's "post hoc rationalizations for agency action" and reasserting that "an agency's action must be upheld, if at all, on the basis articulated by the agency itself").

Additionally, while a single breach may itself be temporary, the Forest Service's annual monitoring reports indicate consistent unauthorized use. Thus, at a minimum, illegal temporary use appears to impact grizzly bears "in a manner ... not previously considered ...." 50 C.F.R. § 402.16(b) ; see Pacificans for a Scenic Coast , 204 F. Supp. 3d at 1092 ("The loss of this benefit necessarily implies that the project's net effect on listed species and their habitat will be greater than previously thought."). Reinitiation is therefore also required under § 402.16(b).

c. Reinitiation under subsection (c)

Finally, "[r]einitiation of formal consultation is required ... [i]f the identified action is subsequently modified in a manner that causes an effect to the listed species or critical habitat that was not considered in the biological opinion." 50 C.F.R. § 402.16(c). Where an action agency does not reinitiate consultation despite the failure of promised conservation measures, the governing biological opinion becomes invalid. Ctr. for Biological Diversity v. U.S. Bureau of Land Mgmt. , 698 F.3d 1101, 1115 (9th Cir. 2012). However, an action agency is not required to reinitiate consultation due to infrequent, isolated, or insignificant deviations from the biological opinion. Forest Guardians v. Johanns , 450 F.3d 455, 465 (9th Cir. 2006).

Alliance argues that ineffective road closures are a broken conservation promise. It further argues that the absence of mandatory monitoring will prevent the discovery of failed closures, thus rendering them continually ineffective. In response, Defendants insist the conservation measures in the biological opinion are being fulfilled. Alliance has the better argument.

As made clear by the Ninth Circuit, "ineffective" closures do not live up to Access Amendments standards, All. for the Wild Rockies , 856 F.3d at 1243, which in turn provide the standard for protection under the ESA. And, because monitoring in BORZ areas is not required, it is reasonable to assume ineffective closures have gone undetected. But even to the extent they are documented in the Forest Service's annual monitoring reports, ineffective closures consistently add mileage in the BORZ areas every year. See AR11, 24, 37, 49, 55, 68, 81. Contrary to Defendants' position, these breaches are not isolated or "infrequent and insignificant deviations" from the biological opinion. Forest Guardians , 450 F.3d at 465. The Forest Service is not required to reinitiate consultation in "each isolated instance in which" there was an ineffective barrier. Id. Rather, the record shows chronic deviations from the effective closures envisioned in the Biological Opinion. As a result, reinitiation is also appropriate under § 402.16(c).

3. Pilgrim Project

Alliance further argues that reinitiation is required for the Pilgrim Project because infirm closures related to the Project place the Clark Fork BORZ area above the 2010 baselines identified in the Access Amendments. The Pilgrim Project proposed an increase of 4.7 miles in roads. AR12:000900 (Table 3). But, according to the Forest Service, mileage will revert back to below the baseline of 256.1 miles after the project because "[u]pon completion of project-related activities all of the previously restricted and new roads used for the project will be closed with permanent closure device (earth berm, rocks, reclamation) and closure order." AR12:000901. Alliance's argument is based on the recent addition of 0.35 miles of permanent road for Road 14622 within the Clark Fork BORZ area. AR4:000209. With this additional mileage, so the argument goes, the pre-Project baseline increases to 256.4. This means that even if the 4.7 miles are effectively closed, the Clark Fork BORZ area will be above the Table 4 baseline of 256.1. See AR284:001571.

Alliance's argument regarding the specific 0.35 miles misses the point. Even if the decision documents predicted the Clark Fork BORZ area would be at its baseline capacity at the time the Project began, the annual monitoring reports show that the total linear mileage within the Clark Fork BORZ area has continually remained below the baseline level of 256.1 miles and, most recently, was at 250.4 miles. See AR4:000209–10. Thus, even considering the 0.35 additional miles, the Project would not push the Clark Fork BORZ area above baseline. See id. The record therefore does not definitively show that take under the Project would exceed permissible levels in the Clark Fork BORZ area as to amount to a Section 9 violation. Nevertheless, Alliance argues that there are additional ineffective closures in the Clark Fork BORZ area, see AR232:000767, that are not reflected in the 2018 monitoring report, (Doc. 44-1). Even though the Forest Service insists that ineffective closures have been considered in concluding that baseline levels would not be exceeded, AR232:000768, the continued uncertainty as to the scope of illegal use weighs in favor of Alliance.

Regardless, reinitiation is appropriate because the Pilgrim Project is tiered to the Access Amendments. The program documents for the Pilgrim Project "confirm[ ] that the baseline access condition and the effects on grizzly bears were considered in the 2011 programmatic biological opinion and the project is in compliance with that biological opinion and incidental take statement." AR12:000930. As a result, "no second-tier biological opinion" was completed for the Project. Id. Because reinitiation of consultation is required for the Access Amendments, reinitiation is necessarily required for the Pilgrim Project. See 50 C.F.R. § 402.16(b), (c).

B. Supplemental EIS for the Pilgrim Project

NEPA is a procedural statute that requires agencies to carefully consider the impacts of, and the alternatives to, federal actions significantly affecting the environment. 42 U.S.C. §§ 4321, 4331. Its purpose is to ensure that agencies take a "hard look" at the environmental consequences of their proposed actions before proceeding. Robertson v. Methow Valley Citizens Council , 490 U.S. 332, 350–51, 109 S.Ct. 1835, 104 L.Ed.2d 351 (1989). As part of that process, agencies prepare an EIS for any proposed federal action "significantly affecting the quality of the human environment." 42 U.S.C. § 4332(2)(C). Once completed, agencies have "a continuing duty to supplement existing ... EISs in response to ‘significant new circumstances or information relevant to environmental concerns and bearing on the proposed action or its impacts.’ " Idaho Sporting Cong., Inc. v. Alexander , 222 F.3d 562, 566 n.2 (9th Cir. 2000) (quoting 40 C.F.R. § 1502.9(c)(1)(ii) ). While supplementation is not required "every time new information comes to light after the EIS is finalized," Marsh v. Or. Nat. Res. Council , 490 U.S. 360, 373, 109 S.Ct. 1851, 104 L.Ed.2d 377 (1989), a supplemental EIS "is required ... if changes, new information, or circumstances may result in significant environmental impacts in a manner not previously evaluated and considered," N. Idaho Cmty. Action Network v. U.S. Dep't of Transp. , 545 F.3d 1147, 1157 (9th Cir. 2008) (internal quotation marks omitted). In this context, the determinative question is whether "the agency has made a reasoned decision based on its evaluation of the significance—or lack of significance—of the new information." Marsh , 490 U.S. at 378, 109 S.Ct. 1851. An impact on a threatened or endangered species is a factor that indicates potential significance. 40 C.F.R. § 1508.27(b)(9).

Alliance insists that a supplemental EIS is necessary here because ineffective closures and the attendant illegal road use will have effects on grizzly bears that may differ from those considered during the original NEPA process. The Draft EIS for the Pilgrim Project contains seven pages of grizzly bear analysis, see AR11:000454–61, and ultimately assumed that all road closures would be effective following the completion of the Project, see AR11:000459. Alliance argues that the eight years of monitoring data shows that ineffective closures and illegal road use defy that assumption. The Forest Service, on the other hand, prepared a Supplemental Information Report in February 2019 concluding that additional NEPA review was not necessary. See AR232:000765–68. That Report noted temporary increases in total mileage but concluded that there were no permanent increases and, even including temporary roads related to the Project, that mileage remained below Clark Fork BORZ area baseline levels. Id. While supplemental information reports are not NEPA documents, courts have upheld their use "for the purpose of determining whether new information or changed circumstances require the preparation of a supplemental EA or EIS." Idaho Sporting Cong. , 222 F.3d at 566.

As argued by Defendants, the Draft EIS for the Pilgrim Project addressed displacement and disturbance of grizzly bears within the Clark Fork BORZ area: "Human activity within proposed harvest units and along roads has the potential to disturb grizzly bears. These disturbances disrupt a grizzly bear's living patterns, such as the amount of time spent feeding or resting. Ultimately these repeated disruptions may reduce the health and fitness of a bear." AR11:000457. These effects were also discussed in the 2011 Access Amendments EIS:

In general, these areas have less secure habitat and a higher risk of displacement, disturbance, and mortality to grizzly bears due to the total amount of motorized access and the proportion of open to total roads on the landscape. These conditions are in contrast to areas available to grizzly bears within the respective recovery zones. The observational data indicates that there are very few bears using these areas of higher motorized access outside the recovery zone boundaries. Therefore, it is likely these degraded conditions are affecting very few bears.

AR282:001157. However, the "Direct and Indirect Effects" section of the Project EIS specifically relies on restricted public access to roads. See AR11:000459. Thus, while the agency considered bear disturbance and displacement, the actual effects analyzed were limited by its assumption that public use would be effectively restricted. As argued by Alliance, that assumption has shown false, making the ineffectiveness of the road closures a "significant new circumstance[ ] or information relevant to environmental concerns" that was not previously considered. See 40 CFR § 1502.9(c) ; Native Ecosystems Council v. Tidwell , 599 F.3d 926, 937 (9th Cir. 2010) (holding that an environmental assessment "predicated on the assumption that no [sage grouse] nesting habitat existed in the project area" did not adequately address impacts of the project).

But Defendants maintain that any such impacts are not "significant" because even if illegal road use was not specifically considered, the impacts of permanent road mileage within the Clark Fork BORZ area, which was considered, remains below baseline levels. The only real argument Alliance provides in response is that a lack of consistent monitoring makes the extent of ineffective road closures unclear. But such uncertainty does not necessarily translate into "significant new circumstances." Nor does the requirement for reinitiation under the ESA necessarily mandate supplemental NEPA analysis. See W. Watersheds Project v. Salazar , 993 F. Supp. 2d 1126, 1142 (C.D. Cal. 2012). This therefore leads to the close question of whether the incorrect assumptions of the NEPA documents coupled with the uncertainty of the extent of ineffective closures is sufficient to trigger supplemental analysis. It is. C.f. All. for the Wild Rockies v. Savage , 897 F.3d 1025, 1036 n.18 (9th Cir. 2018) (highlighting uncertainty of whether roads labeled "undetermined" were included in Access Amendments baseline). A supplemental EIS is therefore necessary.

CONCLUSION

Based on the foregoing, IT IS ORDERED that Alliance's motion to supplement (Doc. 32) is DENIED. Alliance's motion for summary judgment (Doc. 36) is GRANTED. Defendants' cross-motion for summary judgment (Doc. 40) is DENIED. This matter is remanded to the agencies to reinitiate consultation for both the Access Amendments and the Pilgrim Project and prepare a supplemental EIS for the Pilgrim Project. The Clerk is directed to enter judgment and close the case.


Summaries of

All. for Wild Rockies v. Probert

UNITED STATES DISTRICT COURT FOR THE DISTRICT OF MONTANA MISSOULA DIVISION
Oct 3, 2019
412 F. Supp. 3d 1188 (D. Mont. 2019)

finding that biological opinion was flawed because the Service failed to consider temporary increases in motor route density as a result of ineffective road closures

Summary of this case from WildEarth Guardians v. Steele

concluding that Fish and Wildlife Service's failure to consider impact of ineffective road closures constituted a violation of the ESA

Summary of this case from WildEarth Guardians v. Steele

rejecting argument that reinitiation claim cannot be made against the FWS because it lacks the authority to require an action agency to reinitiate consultation as inconsistent with the Ninth Circuit's view

Summary of this case from Ctr. for Biological Diversity v. U.S. Forest Serv.

In Probert, Plaintiff was able to demonstrate persistent illegal road use and ineffective closures with eight years of monitoring data, and the “ineffectiveness of the road closures” there was “a significant new circumstance [] or information relevant to environmental concerns' that was not previously considered.” 412 F.Supp.3d at 1207-08 (quoting 40 C.F.R. § 1502.9(c) (2018)).

Summary of this case from All. for the Wild Rockies v. Gassman

In Probert, USFS had prepared an EIS for a logging project located in the Clark Face BORZ on the Kootenai National Forest.

Summary of this case from All. for the Wild Rockies v. Gassman
Case details for

All. for Wild Rockies v. Probert

Case Details

Full title:ALLIANCE FOR THE WILD ROCKIES, Plaintiff, v. CHERYL PROBERT, Kootenai…

Court:UNITED STATES DISTRICT COURT FOR THE DISTRICT OF MONTANA MISSOULA DIVISION

Date published: Oct 3, 2019

Citations

412 F. Supp. 3d 1188 (D. Mont. 2019)

Citing Cases

All. for the Wild Rockies v. Gassman

Alliance relies on Alliance for the Wild Rockies v. Probert, which considered whether the Forest Service…

Ctr. for Biological Diversity v. U.S. Forest Serv.

Like with the other road-based arguments addressed above, the parties use the previous illegal roads cases as…