W. Va. Code R. § 64-63-8

Current through Register Vol. XLI, No. 45, November 8, 2024
Section 64-63-8 - Asbestos Project Designer Duties

Licensed asbestos project designers shall generate a written project design that provides:

8.1. A chronological time frame for each facet of the abatement activity;
8.2. The name and address of the building or other man-made structure where each asbestos abatement project is to occur;
8.3. The name, address, phone number, and copies of the asbestos-abatement training certificates and licenses of the project designer;
8.4. A schematic floor plan showing the asbestos abatement project area, including a description of the characteristics of the material;
8.5. A statement identifying the abatement activity as repair, removal, encapsulation, or enclosure;
8.6. A schematic floor plan of the containment area which shows the physical dimensions, entrance, exit, windows, decontamination unit, load-out area, emergency exits, placement of the HEPA exhaust air filtration units, any measuring devices, warning signs, and barrier tape;
8.7. The specifications for:
8.7.a. The construction of and the amounts of materials needed to build the project containment area structure, which shall be separated from the uncontaminated environment by polyethylene sheeting or other materials used in conjunction with the existing floors, ceilings, and walls of the structure;
8.7.b. The number and capacity of HEPA exhaust air filtration units and backups;
8.7.c. Air monitoring of personnel; and
8.7.d. Clearance of the contained work area for reoccupancy, including the number of sample collection points and the analytical method to be employed;
8.8. A schematic location and the specifications for the heating, ventilation and air-conditioning system shut-offs, electrical power, water source, fire exits, fire extinguisher, fire alarm, telephone, tool and equipment room, supply box, air monitoring station, project field office, and bathrooms;
8.9. A description of the work procedures to be used; and
8.10. A description of the materials and tools to be used in the abatement project.

W. Va. Code R. § 64-63-8