Wash. Admin. Code § 504-50-020

Current through Register Vol. 24-12, June 15, 2024
Section 504-50-020 - [Effective 7/1/2024] Project construction cost

Whenever the estimated cost of any construction does not exceed $350,000, the university is authorized to use the statewide small works roster, or a WSU established small works roster in lieu of public advertisement for bids. In the event that the legislature further increases the small works roster limit, the university is authorized to use the small works roster for any projects up to the legislatively authorized limit. No project shall be broken into units or phases for the purpose of avoiding the maximum dollar amount of a contract that may be met using the small works roster.

Wash. Admin. Code § 504-50-020

Amended by WSR 24-10-032, Filed 4/23/2024, effective 7/1/2024

Statutory Authority: RCW 28B.30.150. 09-19-071, § 504-50-020, filed 9/15/09, effective 10/16/09. Statutory Authority: RCW 39.04.155. 01-13-103, § 504-50-020, filed 6/20/01, effective 7/21/01.