9 Va. Admin. Code § 25-875-1410

Current through Register Vol. 41, No. 4, October 8, 2024
Section 9VAC25-875-1410 - Fees for the modification or transfer of individual permits or of registration statements for the General VPDES Permit for Discharges of Stormwater from Construction Activities

The following fees apply to modification or transfer of individual permits or of registration statements for the General VPDES Permit for Discharges of Stormwater from Construction Activities issued by the department. If the permit modifications result in changes to stormwater management plans that require additional review by the VESMP authority, such reviews shall be subject to the fees set out in this section. The fee assessed shall be based on the total disturbed acreage of the site. In addition to the permit modification fee, modifications resulting in an increase in total disturbed acreage shall pay the difference in the initial permit fee paid and the permit fee that would have applied for the total disturbed acreage in 9VAC25-875-1400. No modification or transfer fee shall be required until such department-approved programs exist. These fees shall only be effective when assessed by a VESMP authority, including the department when acting in that capacity, that has been approved by the department. No modification fee shall be required for the General VPDES Permit for Discharges of Stormwater from Construction Activities for a state agency or federal entity that is administering a project in accordance with approved standards and specifications but shall apply to all other state or federal agency projects.

General / Stormwater Management - Small Construction Activity/Land Clearing (Areas within common plans of development or sale with land-disturbance acreage less than one acre, except for single-family detached residential structures)

$20

General / Stormwater Management - Small Construction Activity/Land-Disturbing Activity in a Chesapeake Bay Preservation Area (not subject to General Permit coverage)/Land Clearing (Single-family detached residential structures within or outside a common plan of development or sale with land-disturbance acreage less than five acres where the locality is the VESMP authority)

$20

General / Stormwater Management - Small Construction Activity/Land Clearing (Single-family detached residential structures within or outside a common plan of development or sale with land-disturbance acreage less than five acres where the department is the VSMP authority)

$0

General / Stormwater Management - Small Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than one and less than five acres)

$200

General / Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than five acres and less than 10 acres)

$250

General / Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 10 acres and less than 50 acres)

$300

General / Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 50 acres and less than 100 acres)

$450

General / Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 100 acres)

$700

Individual VPDES Permit for Discharges of Stormwater from Construction Activities

$5,000

9 Va. Admin. Code § 25-875-1410

Derived from Virginia Register Volume 40, Issue 8, eff. 7/1/2024.

Statutory Authority: § 62.1-44.15:28 of the Code of Virginia; Chapters 68 and 758 of the 2016 Acts of Assembly.