Okla. Admin. Code § 252:100-8-1.2

Current through Vol. 42, No. 1, September 16, 2024
Section 252:100-8-1.2 - General information
(a)Permit categories. Two types of construction and operating permits are available: general permit and individual permit.
(1)General permit.
(A) A general permit may be issued for an industry if there are a sufficient number of facilities that have the same or substantially similar operations, emissions and activities which are subject to the same standards, limitations and operating and monitoring requirements.
(B) Facilities may be eligible for authorization under a general permit if the following criteria are met:
(i) The facility has actual emissions of 100 tpy or more of any one regulated air pollutant emitted and/or is a Part 70 source.
(ii) The DEQ has issued a general permit for the industry.
(2)Individual permit. Facilities requiring permits under this Subchapter that do not qualify for a general permit shall obtain individual permits. An owner or operator may apply for an individual permit even if the facility qualifies for a general permit.
(b)Applicability determination. Any person may submit a request in writing that the DEQ make a determination as to whether a particular source or installation, which that person operates or proposes to operate, is subject to the permit requirements of this Subchapter. The request must contain sufficient information for the DEQ to make the requested determination and the required fee. The DEQ may request any additional information that it needs for purposes of making the determination.

Okla. Admin. Code § 252:100-8-1.2

Added at 15 Ok Reg 2590, eff 6-25-98