N.H. Admin. Code § Saf-C 5020.02

Current through Register No. 45, November 7, 2024
Section Saf-C 5020.02 - Trenched Finale Mortars

Each finale mortar shall be buried in a trench at least 3/4 of its length, but in no case shall the protrusion above ground exceed 10 inches. All seam welds, whenever practicable, shall face away from the audience. Burial shall be in a trench only. Finale mortars shall not be buried in rows in an open pit-like excavation.

N.H. Admin. Code § Saf-C 5020.02

(See Revision Note at Chapter heading for Saf-C 5000) #6055, eff 7-1-95, EXPIRED: 7-1-03

New. #8117, INTERIM, eff 7-14-04, EXPIRED: 1-10-05

New. #8261, eff 1-21-05; ss by #9765-A, eff 8-2-10

Amended by Volume XXXIX Number 16, Filed April 18, 2019, Proposed by #12738, Effective 4/30/2019, Expires 4/30/2029.