The commissioner shall schedule a hearing within a reasonable period of time, but in no event more than 60 calendar days after the date he received the request. The commissioner shall provide at least 7 calendar days advance notice of the hearing. The hearing shall be held in a town in which the body of water under consideration is located, or in a contiguous town.
N.H. Admin. Code § Saf-C 412.02
(See Revision Note #2 at chapter heading) #9544, eff 9-15-09