Applications for building permits for modular buildings and building components shall, in addition to any other requirements, include the following:
(a) A statement that the work performed pursuant to the building permit shall include the installation of a certified modular building or building component that meets the requirement of these rules; and(b) The address and signature of the applicant or his or her agent.N.H. Admin. Code § Saf-C 3311.01
#5439, eff 7-24-92; ss by #6810, INTERIM, eff 7-25-98, EXPIRES: 11-22-98; ss by #6885, eff 11-18-98;ss by #8741, INTERIM, eff 11-18-06, EXPIRED: 5-17-07
New. #9752, eff 7-9-10
Amended by Volume XXXIX Number 16, Filed April 18, 2019, Proposed by #12737, Effective 3/8/2019, Expires 3/8/2029.