Plans and specifications for any substantial hospital construction or remodeling should be prepared by competent architects and engineers licensed to practice in the state and who assume responsibility for supervising the construction. The following plans shall be submitted to the Licensing Agency for review:
1. Preliminary Plans - To include schematics of buildings, plot plans showing size and shape of entire site, existing structures, if any, streets and location and characteristics of all needed utilities, floor plans of every floor dimensioned and with proposed use of each room or area shown. If for additions or remodeling, provide plan or of existing building showing all proposed alterations, outline specifications to include a general description of the construction, type of finishes, and type of heating, ventilating, plumbing and electrical systems proposed.2. Final Working Drawings and Specifications - Complete and in sufficient detail to be the basis for the award of construction contracts.15 Miss. Code. R. 16-1-41.9.2
Miss. Code Ann. § 41-9-17