Type of Stage II Vapor Recovery System | Initial Test | Frequency of Retest |
(a) Vapor Balance System | Dynamic Back Pressure | 12 months |
Leak Test | 12 months | |
Leak Rate and Cracking Pressure | 12 months | |
Tie-Tank Test | 12 months | |
Liquid Blockage Test | 5 years | |
(b) Vapor Assist System- Type 1 | Air to Liquid Ratio Test | 12 months |
Leak Test | 12 months | |
Leak Rate and Cracking Pressure | 12 months | |
Tie-Tank Test | 12 months | |
Liquid Blockage Test | 5 years | |
(c) Vapor Assist System- Type 2 Model 400 | Nozzle Regulation Test | 12 months |
Vapor Return Leak Tightness Test | 12 months | |
Leak Rate and Cracking Pressure | 12 months | |
Tie-Tank Test | 12 months | |
(d) Vapor Assist System- Type 2 Model 600 | Air to Liquid Ratio Test | 12 months |
Vapor Return Line Vacuum Integrity Test | 12 months | |
Leak Rate and Cracking Pressure | 12 months | |
Tie-Tank Test | 12 months |
Md. Code Regs. 26.11.24.04
Regulation .04 amended effective 42:23 Md. R. 1435, eff.11/23/2015