Remote register readings shall be maintained identical to readings of the meter register.
"Advances for construction costs" means cash payments or surety bonds or an equivalent surety made to the utility by an applicant for an extension, portions of which may be refunded depending on any subsequent connections made to the extension. Cash payments, surety bonds, or equivalent sureties shall include a grossed-up amount for the income tax effect of such revenue.
"Agreed-upon attachment period" means a period of not less than 30 days nor more than one year mutually agreed upon by the utility and the applicant within which the customer will attach. If no time period is mutually agreed upon, the agreed-upon attachment period shall be deemed to be 30 days.
"Contribution in aid of construction" means a nonrefundable cash payment covering the costs of an extension that are in excess of utility-funded allowances. Cash payments shall be grossed-up for the income tax effect of such revenue. The amount of tax shall be reduced by the present value of the tax benefits to be obtained by depreciating the property in determining the tax liability.
"Customer advance for construction record" means a separate record established and maintained by the utility, which includes by depositor, the amount of advance for construction provided by the customer, whether the advance is by cash or surety bond or equivalent surety, and if by surety bond, all relevant information concerning the bond or equivalent surety, the amount of refund, if any, to which the depositor is entitled, the amount of refund, if any, which has been made to the customer, the amount unrefunded, and the construction project on which or work order pursuant to which the extension was installed.
"Estimated annual revenues" means an estimated calculation of annual revenue based upon the following factors, including but not limited to: the size of the facility to be used by the customer, the size and type of equipment to be used by the customer, the average annual amount of service required by the equipment, and the average number of hours per day and days per year the equipment will be in use.
"Estimated construction costs" means an estimated calculation of construction costs using average costs in accordance with good engineering practices and based upon the following factors: amount of service required or desired by the customer requesting the extension; size, location and characteristics of the extension, including all appurtenances; and whether or not the ground is frozen or whether other adverse conditions exist. The average cost per foot shall be calculated utilizing the prior calendar year costs, to the extent such cost basis does not exceed the current costs using current construction cost methodologies, resources and material, and working conditions, divided by the total feet of extensions by size of pipe for the prior calendar year. In no event shall estimated construction costs include costs associated with facilities built for the convenience of the utility.
"Extensions" means a distribution main extension.
"Similarly situated customer" means a customer whose annual consumption or service requirements, as defined by estimated annual revenue, are approximately the same as the annual consumption or service requirements of other customers.
Iowa Admin. Code r. 199-21.3