(a) An installation permit shall be issued by the department based on the approval of drawings and specifications pertaining to the installation of pressure retaining items. An application shall be submitted in the prescribed form and must be accompanied by the remittance fee for each pressure retaining item subject to this part as per the schedule in Exhibit A, titled, "Installation, Repair or Alteration Permit Fees, and Licensure, Examination, and Registration Fees", dated October 1, 2023, which is made part of this chapter, and located at the end of this chapter, and inspection fee for each boiler, pressure vessel, or pressure system subject to this part as per the schedule in Exhibit B, titled, "Internal & External Inspection Fees", dated October 1, 2023, which is made a part of this chapter and located at the end of this chapter. The contractor shall be responsible for furnishing to the department all documentation required and referenced in the standards and codes adopted by the department for installation, construction, routine repair, repair, or alteration of any pressure retaining item, NBEP, and HEP.