Project information: | Including: |
(1) Contact information | The name, address, email address, and phone number of an authorized representative. |
(2) The site assessment or technology testing concept | A discussion of the objectives; description of the proposed activities, including the technology you will use; and proposed schedule from start to completion. |
(3) Designation of operator, if applicable | As provided in § 585.405 . |
(4) Commercial lease stipulations and compliance | A description of the measures you took, or will take, to satisfy the conditions of any lease stipulations related to your proposed activities. |
(5) A location plat, or indicative layout | The range of surface locations and associated water depths for proposed structures, facilities, and appurtenances located both offshore and onshore, including all anchor and mooring data; and the location and associated water depths of all existing structures. |
(6) General structural and project design, fabrication, and installation | For facilities deemed complex or significant you must provide preliminary design information for each facility associated with your site assessment activity and subpart G of 30 CFR part 285 applies. For facilities not deemed complex or significant you must provide final design information. |
(7) Deployment activities | A description of the safety, prevention, and environmental protection features or measures that you will use. |
(8) Your proposed measures for avoiding, minimizing, reducing, eliminating, and monitoring environmental impacts | A description of the measures you will use to avoid or minimize adverse effects and any potential incidental take, before you conduct activities on your lease, and how you will mitigate environmental impacts from your proposed activities, including a description of the measures you will use as required by §§ 585.700 through 585.703 . |
(9) Project verification strategy | An analysis supporting your recommendation as to whether your site assessment activities should be determined complex or significant. If your recommendation supports a complex or significant determination, describe your strategy for compliance with 30 CFR 285.705 through 285.714 . |
(10) References | A bibliographic list of any document or published source that you cite as part of your plan. You may reference information and data discussed in other plans that you previously submitted or that are otherwise readily available to BOEM. |
(11) Decommissioning and site clearance procedures | A discussion of general concepts and methodologies. |
(12) Air quality information | Information as described in § 585.700 . |
(13) A listing of all Federal, State, and local authorizations or approvals required to conduct site assessment activities | A statement indicating whether you have applied for or obtained such authorization or approval from the U.S. Coast Guard, U.S. Army Corps of Engineers, and any other applicable Federal, State, or local authorizers. |
(14) A list of agencies and persons with whom you have communicated, or with whom you will communicate, regarding potential impacts associated with your proposed activities | Contact information and issues discussed. |
(15) Financial assurance information | Statements attesting that the activities and facilities proposed in your SAP are or will be covered by an appropriate bond or other approved financial assurance instrument as required in § 585.516 and §§ 585.525 through 585.529 . |
(16) Information you incorporate by reference | A list of the documents you have incorporated by reference and their public availability. |
(17) Other information | Additional information as required by BOEM. |